Request for Proposals for Shipyard Lease – San Francisco
Print this Article | Send to Colleague
The Opportunity – The Port of San Francisco is proud to circulate this Request for Proposals seeking a partner to lease a historically successful ship repair facility and its related equipment ("the Shipyard") that collectively is undergoing an unprecedented refresh of new investment. As a public agency, the port is seeking a partner that will fulfill the critical goals of continuous operations and associated employment to achieve financial returns for both the lessee and the port.
The Shipyard Site includes approximately 14.7 acres of land improved with sixteen buildings and 17.4 acres of submerged lands with tenant-controlled access. Additionally, the Shipyard includes significant Port-owned assets, including floating Dry Dock #2, floating Dry Dock Eureka, and an 8k ampere Shoreside Power System.
The Opportunity also includes the ability to benefit from Port investments and agreements improving the operational profile at the Shipyard, both from the recent past and currently underway. These include, but are not limited to:
Click here for direct links to all relevant and supporting documents. BE SURE TO "BOOKMARK" the site you will be directed to so as to avoid having to register each time you want to access in the future.
Contact: Jeff Bauer, Shipyard RFP Project Manager, Port of San Francisco Pier 1, the Embarcadero
San Francisco, CA 94111. Tel: (415) 274-0514. Email: jeff.bauer@sfport.com.
The Shipyard Site includes approximately 14.7 acres of land improved with sixteen buildings and 17.4 acres of submerged lands with tenant-controlled access. Additionally, the Shipyard includes significant Port-owned assets, including floating Dry Dock #2, floating Dry Dock Eureka, and an 8k ampere Shoreside Power System.
The Opportunity also includes the ability to benefit from Port investments and agreements improving the operational profile at the Shipyard, both from the recent past and currently underway. These include, but are not limited to:
- A $5 million project completed in 2008 that upgraded Dry Dock #2 to post-Panamax lifting capacity.
- A significant electrical system upgrade and power grid separation project currently underway and anticipated to be completed in April, 2018.
- Construction of a new 19th Street extension off Illinois Street to give the Shipyard a more direct access and minimize conflicts with new tenants in the area anticipated to be completed in April, 2018.
- Demolition and removal of two structurally deficient buildings, creating 20,000 additional feet of usable land area and other improvements to Shipyard facilities and buildings, currently underway and anticipated to be completed in April 2018.
- A dredging project to include a dredging beneath Dry Dock #2 to a depth of 60 feet and Wharf 4 East to a depth of 30 feet including dredge support costs such as testing, permitting management fees along with mobilization, deployment, fees and management costs.
- A nearly-final Project Partnership Agreement with the U.S. Army Corps of Engineers for the continued dredging of the Central Basin, the access way into and out of the Shipyard.
Click here for direct links to all relevant and supporting documents. BE SURE TO "BOOKMARK" the site you will be directed to so as to avoid having to register each time you want to access in the future.
Contact: Jeff Bauer, Shipyard RFP Project Manager, Port of San Francisco Pier 1, the Embarcadero
San Francisco, CA 94111. Tel: (415) 274-0514. Email: jeff.bauer@sfport.com.