Updating COVID-19 variances for BOMA BEST

More than 12 months into the COVID-19 pandemic, this global event has caused significant disruption in building operations due to a reduction in building occupant density as a result of public health and workplace safety measures. However, professionals have identified the best way to continue offering services while respecting safety guidelines.

While some work should be paused, much can be resumed. BOMA Canada has updated their guidance for answering questions in the BOMA BEST Sustainable Buildings program. Consult the Updated Guidance for BOMA BEST – Impact of COVID-19 for more detail.

Answering BOMA BEST questionnaire

All BEST Practices and BOMA BEST questions have been reviewed and updated. The following approach is now required:

AND

AND

Verification

On-site verifications can continue provided the following three conditions have been met:

  1. The region permits such activity;
  2. The on-site representative agrees;
  3. The verifier agrees. We encourage all parties to take the necessary precautions to ensure they feel comfortable and safe moving forward, as well as follow all required guidelines associated with safe distancing and the use of personal protective equipment as mandated by the region.

If the conditions above cannot be met, a remote verification can occur instead. Remote verifications are available in all jurisdictions and for all levels of BOMA BEST.

Consult the BOMA BEST FAQ for more information on the remote verification process.