CDA/ACB Gazette
 
January 2020 / janvier 2020
 
 

Changes to Engineer-of-Record Approved

Print Print this Article | Send to Colleague

In 2018 and 2019, a Working Group that was comprised of representatives of the CDA Mining Dams Committee and Dam Safety Committee drafted a revision to Section 3.1 of the CDA Technical Bulletin: Application of Dam Safety Guidelines to Mining Dams (2014). This revision addresses dam safety management and the engineer of record. 

The revision was approved by the Board of Directors in the summer. The English PDF version of the Bulletin has been updated and is available through CDA’s online library for members free of charge. It is also being sold in PDF through the CDA Shop.

The 2019 English print version will be available for sale in the new year.

The 2019 French, Spanish and Portuguese versions will be available in 2020. At this time, the French 2014 edition is available.

CDA would like to thank its volunteers for their time and efforts into updating this guidance document.

Andy Small (Working Group Chair), Klohn Crippen Berger, Fredericton, NB
Jarrod Malenchak (Dam Safety Committee Chair), Manitoba Hydro, Winnipeg, MB
Greg Noack (Mining Dams Committee Chair), Klohn Crippen Berger, Toronto, ON
Allan Kirkham (CDA Coordinator), retired, Picton, ON
Des Hartford, BC Hydro, Vancouver, BC
Michel Julien, Agnico Eagle Mines Limited, Toronto, ON
Scott Martens, CNRL, Calgary, AB
Anthony Rattue, SNC Lavalin, Montréal, QC

Interested individuals can download the revisions to Section 3.1 on this page. (Note: The revisions are only available in English.)

 

Back to CDA/ACB Gazette