CDA/ACB Gazette
Knight Piesold Ltd.
Geniglace Inc.
Kleinschmidt Associates
CDA News / Nouvelles de l'ACB

As one of the benefits of CDA membership, CDA members receive access to ICOLD bulletins. 

During the last ICOLD General Assembly that was held in New Delhi, on October 3rd, eight bulletins were approved.

These bulletins have been added to the CDA Members’ Only section of the website, under the ICOLD Committee section, as well as on the ICOLD website in the publication tab, in their "pre-print” format.
https://www.icold-cigb.org/GB/publications/bulletins.asp

These bulletins are:

  • Bulletin 199: The sustainability of concrete dams: Volume 1 - Design and construction
  • Bulletin 200: Climate-induced water shortage and drought risk management Climate resilience of water resources systems
  • Bulletin 201: Role of Hydropower in climate change mitigation and new energy mix
  • Bulletin 202: Non-linear modelling of concrete dams
  • Bulletin 203: Best practices for achieving reliability of flood discharge gates
  • Bulletin 204: Flood risk assessment
  • Bulletin 205: Application of online monitoring technology in the integrated operation of hydropower stations and reservoirs
  • Bulletin 206: Arch dam design: structural analysis methodologies and criteria


They are available for members for free.
To access these bulletins on the ICOLD website, you must have your account fully completed with your National Committee and your National Committee code. These two fields (National Committee and National Committee Code) are mandatory to access members-only publications. 

 

L'un des avantages de l'adhésion à l'ACB est l'accès aux bulletins de la Commission internationale des grands barrages (CIGB).

Lors de la dernière assemblée générale de la CIGB qui s'est tenue à New Delhi, le 3 octobre dernier, huit bulletins ont été approuvés. Ceux-ci ont été ajoutés à la section du site Web réservée aux membres de l'ACB, sous l’onglet de la Commission internationale des grands barrages, ainsi que sur le site Web de la CIGB sous l'onglet « Publications » dans leur format « préimpression » (en anglais).
https://www.icold-cigb.org/GB/publications/bulletins.asp

Ces bulletins sont les suivants :

  • Bulletin 199 : The sustainability of concrete dams: Volume 1 - Design and construction
  • Bulletin 200 : Climate-induced water shortage and drought risk management Climate resilience of water resources systems
  • Bulletin 201 : Role of Hydropower in climate change mitigation and new energy mix
  • Bulletin 202 : Non-linear modelling of concrete dams
  • Bulletin 203 : Best practices for achieving reliability of flood discharge gates
  • Bulletin 204 : Flood risk assessment
  • Bulletin 205 : Application of online monitoring technology in the integrated operation of hydropower stations and reservoirs
  • Bulletin 206 : Arch dam design: structural analysis methodologies and criteria


Ils sont disponibles gratuitement pour les membres.
Pour accéder à ces bulletins sur le site de la CIGB, votre compte doit être entièrement complété avec votre Comité national et votre code du Comité national. Ces deux champs (Comité national et code du Comité national) sont obligatoires pour accéder aux publications réservées aux membres. 

 
 

In this issue:

- Canada


 
 

Dans ce numéro :
 
- Canada


 
 

 

The CDA Conference is the premier conference on dams in Canada. Attendees include owners, government regulators, engineering consultants, academics, and technical resources and construction companies.

By being a Sponsor, you have a great opportunity to:

  • Expose your brand
  • Promote your products and services
  • Engage with the conference attendees

Which sponsorship level are you going to choose?
 
Register for sponsorship

See our current Sponsors

 


Le congrès de l'ACB est le principal événement sur les barrages au Canada. Les participants sont des propriétaires, des organismes de réglementation gouvernementaux, des consultants en ingénierie, des universitaires, des entreprises de ressources techniques et de construction.

En devenant commanditaire, vous aurez la possibilité de :
  • promouvoir votre image de marque
  • faire connaître vos produits et services
  • entrer en contact avec les participants au congrès

Quel niveau de commandite allez-vous choisir?

Inscrivez-vous pour une commandite

 

The Canadian Dam Association (CDA) in collaboration with the Brazilian Committee on Large Dams (CBDB) and Vale, will hold an in-person workshop in Belo Horizonte, MG from February 4-6, 2025.

The event will be offered by qualified CDA instructors who have relevant experience and knowledge in international practices.

Schedule:
Tailings Dam Breach Analysis
Dam Safety Review
Emergency Management
 
Event with simultaneous translation.
 
 

L’Association canadienne des barrages (ACB), en collaboration avec le Comité brésilien des grands barrages (CBDB) et Vale, tiendra un atelier en personne à Belo Horizonte (Minas Gerais) du 4 au 6 février 2025.

L’événement sera offert par des instructeurs qualifiés de l’ACB qui possèdent une expérience et des connaissances pertinentes en matière de pratiques internationales.

Programme :
Analyse de la rupture d’une digue à stériles
Examen de la sécurité des barrages
Gestion des urgences
 
Événement avec traduction simultanée.

 

It might be your firewall!

We want you to stay in-the-know and up-to-date with all of our exciting events, announcements, and other membership opportunities, which means you need to be able to receive our emails!

Here are some handy tips to make sure your firewall doesn’t block you from receiving our messages!

 

C’est peut-être votre pare-feu!

Nous voulons que vous demeuriez au courant de tous nos grands événements, annonces et autres possibilités d’adhésion, et cela signifie que vous devez être en mesure de recevoir nos courriels!

Voici quelques conseils pratiques pour vous assurer que votre pare-feu ne vous empêche pas de recevoir nos messages!

 
 
Hydro Component Systems, LLC
REEL COH Inc.
KGS Group
Opportunities / Opportunités

Vous aimeriez changer d'air? Consultez les nouvelles offres d'emploi sur notre site Web. De nouvelles possibilités d'emploi sont régulièrement publiées.


See all Career Opportunities in English

Voir les opportunités de carrière en français

Spillway Safety – Debris Boom Solutions
Worthington Products Inc.®
Optimize spillway safety with Worthington’s floating debris & safety boom solutions. Our booms guard against debris accumulation to prevent spillway clogging and dam overtopping. Worthington barriers keep your operations safe, sustainable, and uninterrupted.
Safety Starts Here >>
Advertisement
 
BBA
Dominion Divers
Preformed Windings: High-Voltage Diamond Coils for Hydropower
Preformed Windings®
Preformed Windings, with over 55 years in high-voltage diamond coil manufacturing, provides quality solutions for OEMs and independent coil shops in hydropower. Focused solely on coil production, we never compete with partners. Our low Partial Discharge coils ensure extended service life, supporting renewable energy and modernization. ISO-certified, we prioritize innovation, R&D, and trusted global partnerships. 
Learn More
Advertisement