Mission Constructors, Inc. is building a new high school for the Montessori Post Oak School just north the The Museum Of Fine Arts. The new facility at 1010 Autrey, is slated to open in August.
The 8,200-square-foot school, designed by Gensler, is situated next door to the existing building. There will be green space between the two buildings, and the full campus will be known as the Post Oak Center for Adolescent Education. A 750-square-foot workshop also will be added to the campus for both schools to share.