|
||||
C.W. Driver Announces Completion of Portola High School in IrvinePrint this Article | Send to Colleague Photo by Kyle Miller, Irvine USD C.W. Driver Companies, an AGC of California and San Diego Chapter member, has announced the completion of Irvine Unified School District’s Portola High School. Constructed to meet criteria developed by the High Performance Index Schools (HPI), which facilitates improved student success by providing exceptional learning environments through high-performance design, construction and operation, Portola High School is set to accommodate 2,400 students and will provide a healthy, energy efficient and state-of-the-art education experience. The 237,000-sq-ft facility which totaled $126 million in construction costs is located on a 43-acre site at 1001 Cadence in Irvine, California and includes 16 campus buildings and three parking lots with a total capacity of 791 vehicles, in addition to an aquatics facility, football stadium, varsity softball and baseball fields along with other various outdoor field facilities. "In order to meet the school district’s construction schedule and accommodate for the large size of the campus, the project was split up into four separate quadrants, which required the project team to provide and staff separate labor crews," said Paul Ruig, project executive at C.W. Driver. "A six-day work week was planned for and contracted in the bids to ensure the project would be completed on-time and within budget."
The Portola High School campus includes high-tech classrooms; a student union featuring collaborative learning environments and common areas; a Learning Commons with a media center with quiet rooms and an "innovation lab;" an elective building that will house cutting edge technologies, resources and materials designed to inspire creativity and collaboration, video production, art and music rooms; dedicated science labs; special education facilities; a 2,044-seat gymnasium, locker room and classroom building; a performing arts building with a 698-seat theater, black box, orchestra pit and second level balcony and dance studio; and an aquatics center with a 50-meter Olympic-sized swimming pool. Additionally, field facilities include a 2,940-seat stadium with an all-weather track and synthetic turf field; a snack bar and restroom building; a storage building; tennis courts; varsity and junior varsity softball and baseball fields with adjoining soccer fields; and outdoor basketball courts.
In addition to Paul Ruig, the C.W. Driver project management team members included Mac Byers, senior project manager; Jonathan Keene, project manager; Richard Thurman, senior superintendent; Adam Underwood, superintendent; and Jim Stammer, superintendent. HMC Architects served as the architect for the project.
C.W. Driver Companies is a premier builder serving California since 1919. As a leader in general contracting and construction management services, C.W. Driver Companies are on the cutting edge across a broad spectrum of industries, including education, commercial/office, technology, healthcare/biomedical, mixed-use, assisted living, entertainment, retail, industrial and civic. C.W. Driver Companies has the ability to build a variety of projects, from large tenant improvements to small renovations and specialized projects through its affiliates: Driver SPG, Driver URBAN and Good & Roberts. C.W. Driver Companies has offices located in Los Angeles, Irvine, Rancho Cucamonga, Anaheim, San Diego, Carlsbad and San Jose. For more information, please visit www.cwdriver.com.
|
||||
Associated General Contractors of America 2300 Wilson Blvd, Suite 300 Arlington, VA, USA Ph: 703-548-3118 Fax: 703-837-5402 |