|
||||
Sullivan County, New York Gets a New Jail after 100 YearsPrint this Article | Send to Colleague Considering the old jail is at least 100 years old, Sullivan County knew years ago, it was essential to build a new, more modernized facility. Subsequently, after talking about it for decades, the Sullivan County lawmakers gave the approval to move forward with construction of a new jail.
"We’re going from an 18th century to a 21st century correctional center," said Sullivan County undersheriff Eric Chaboty. "We skipped the 20th century. We researched so many other jails across the state, and we adopted the ideas that worked." (Excerpt from recordonline.com – Times Herald-Record)
Plans called for a jail of more than 155,000 square feet, with 256 single cells and more than 300 beds, at a new location just outside Monticello on Old Route 17. The new $79 million jail in Sullivan County, New York consists of a new two-story, 300-bed correctional facility featuring 70-sq-ft and 100-sq-ft precast concrete, front chase cells with integral precast concrete bunks.
Contracted to supply the prefabricated concrete cells for the six housing units, Oldcastle Precast, a member of multiple AGC chapters, manufactured the front-chase cells at their Oldcastle Precast Telford, Pennsylvania precast plant and shipped them to the jobsite. A total of 164 precast cells, measuring 70 square feet, and 92 precast cells, measuring 100 square feet, were manufactured for the new jail.
Built in the factory, the modular precast concrete units were outfitted with all furnishings and system tie-ins, including HVAC, plumbing and electrical fixtures, doors, windows and frames. Because modular units are built in a controlled environment, issues such as weather and temperature don’t hamper the construction process as compared to CMU or steel. As the jobsite was prepared, precast cell modules were delivered to the jobsite in Monticello, New York, as needed, for immediate erection. The expedited product delivery and fast erection of the precast cells shortened construction timelines.
The Sullivan County Sheriff’s Office Complex, which includes the new jail, started last October and is currently on time and within budget. The complex is being designed to allow for future expansion and more efficient operations. It will house not only the jail, but also the civil, patrol and administrative divisions.
If construction continues on schedule, the project is expected to be completed by September 2018.
Design Consultants: Mark Kukuvka, of LaBella Associates
General Contractor: The Pike Company, Rochester NY, an AGC of New York State LLC member
Engineer: Pennoni Oldcastle Precast is the clear choice for building products and services for North American infrastructure projects. We are a leading provider of engineered product solutions nationwide to a number of market sectors including: Water, Communications, Energy, and Transportation. https://oldcastleprecast.com/region/modular-group/ www.oldcastleprecast.com
|
||||
Associated General Contractors of America 2300 Wilson Blvd, Suite 300 Arlington, VA, USA Ph: 703-548-3118 Fax: 703-837-5402 |