A new hotel and convention center being built in Tuolumne, CA, is a model of resilient and efficient construction, reports Senior National Resource Director Jon Hansen. The 148-room Black Oak Casino Hotel shown at right is nearing outside completion, with work started on the fourth and final floor using Insulating Concrete Form (ICF) for the exterior walls. The building is scheduled to be completed in Spring 2013.