NRMCA Certifies Knife River EPD Utilizing CSI Tool

As a leading Program Operator for the concrete industry, NRMCA recently verified Environmental Product Declarations (EPD) for Knife River. The EPD covers 479 mix designs produced at the Coffee Lake, Hillsboro, Linnton and Sundial plants in the Portland, OR, market area. The EPD was created by Knife River utilizing the Cement Sustainability Initiative’s Environmental Product Declaration Tool. The CSI EPD Tool was developed to facilitate the generation of sector-specific EPDs for cement and concrete. The cloud-based tool was designed to be easy-to-use, facilitate the overall process and reduce the costs of preparing environmental impact information from cement and concrete production. Knife River’s EPD was verified by the Athena Sustainable Materials Institute.

To date, the U.S. ready mixed concrete industry, including material suppliers, have 34 verified EPDs with a total of 10,042 mixes from 2,761 plants. The growth of EPD activity has doubled in 2018, with expectations to continue due to LEED v4 being discovered in construction documents and specifications.

As part of the Build With Strength campaign, NRMCA promotes Strength Through Transparency for member and industry competitiveness in the green building marketplace and the trends toward product and company transparency.

For more information, contact James Bogdan at jbogdan@nrmca.org or 412-420-4138.

National Ready Mixed Concrete Association