CFTEC Bridge Steel Beam Travels to CF Toronto Eaton Centre
Print this Article | Send to Colleague
VIDEO: #CFTECBridge Steel Beam Travels to CF Toronto Eaton Centre
In the late hours of May 10, 2017, the first piece of the new #CFTECBridge, a 193,000 pound box girder, made its voyage from the Steel City of Hamilton to the heart of the Toronto downtown core. The box beam is integrated into the structural and architectural design of the of the new bridge, which will be constructed on ground next to CF Toronto Eaton Centre before being lifted into place for finishing.
The new bridge represents another significant milestone in the redevelopment of CF Toronto Eaton Centre, helping to realize Cadillac Fairview’s vision of including Hudson’s Bay and Saks Fifth Avenue as part of CF Toronto Eaton Centre and its promise of delivering a premium shopping experience. Watch Here
Click Here for more information about the #CFTECBridge
Video credit: Produced by Sight on Site Inc. for PCL Constructors Canada Inc. (Toronto) and Cadillac Fairview.