TAPPI Over The Wire Paper 360
Past Issues | Printer Friendly | TAPPI.org | Advertise | Buyers Guide | Travels with Larry Archive Facebook Twitter LinkedIn
       

Minimize Converting Line Bottlenecks with New Plant Layout Workshop

Print Print this Article | Send to Colleague


Feb. 21, 2017, in Green Bay, Wis., USA
 
This new, one-day workshop is designed to help improve your converting line productivity. Learn about and work with an innovative tool called the Tissue Plant Layout Simulator that uses your calculations to pinpoint issues and minimize bottlenecks.

Learn to:
  • Apply the continuity principle to converting line analysis
  • Identify tissue converting system bottlenecks and how they move with changes to equipment capabilities and tissue product design
  • Understand the benefits of line speed tuning/harmonization and how to calculate speed balances
  • Utilize process simulation and modeling, and how to apply the technology to understand and improve converting operations
  • Pinpoint typical converting benchmarks on your equipment
  • Understand the application of automatic quality systems in the converting line.
Who Should Attend?
  • Converting Line Superintendents
  • Converting Leaders
  • Process Engineers
  • Design Engineers
  • Suppliers
  • Tissue Planners
  • Product Marketing Personnel.
Register by January 21 to save on registration and group rates.

 

Back to TAPPI: Over The Wire

Share Share on Facebook Share on Twitter Share on LinkedIn