Minimize Converting Line Bottlenecks with a New Plant Layout Simulator
Print this Article | Send to Colleague
Feb. 21, 2017
Green Bay, Wis., USA
This one-day workshop can help you:
- Apply the continuity principle to converting line analysis
- Identify tissue converting system bottlenecks and how they move with changes to equipment capabilities and tissue product design
- Understand the benefits of line speed tuning/harmonization and how to calculate speed balances
- Utilize process simulation and modeling, and how to apply the technology to understand and improve converting operations
- Pinpoint typical converting benchmarks on your equipment
- Understand the application of automatic quality systems in the converting line.
Who Should Attend?
- Converting Line Superintendents
- Converting Leaders
- Process Engineers
- Design Engineers
- Suppliers
- Tissue Planners
- Product Marketing Personnel.
Register by February 1 to save on registration and group rates.