TAPPI Over The Wire Paper 360
Past Issues | Printer Friendly | TAPPI.org | Advertise | Buyers Guide | Travels with Larry Archive Facebook Twitter LinkedIn
       

Minimize Converting Line Bottlenecks with a New Plant Layout Simulator

Print Print this Article | Send to Colleague


Feb. 21, 2017
Green Bay, Wis., USA

This one-day workshop can help you:
  • Apply the continuity principle to converting line analysis
  • Identify tissue converting system bottlenecks and how they move with changes to equipment capabilities and tissue product design
  • Understand the benefits of line speed tuning/harmonization and how to calculate speed balances
  • Utilize process simulation and modeling, and how to apply the technology to understand and improve converting operations
  • Pinpoint typical converting benchmarks on your equipment
  • Understand the application of automatic quality systems in the converting line.
Who Should Attend?
  • Converting Line Superintendents
  • Converting Leaders
  • Process Engineers
  • Design Engineers
  • Suppliers
  • Tissue Planners
  • Product Marketing Personnel.
Register by February 1 to save on registration and group rates.

 

Back to TAPPI: Over The Wire

Share Share on Facebook Share on Twitter Share on LinkedIn