In the course of the rebuild to LEF technology, the flotation cell injectors and the flotation pumps were improved in terms of hydrodynamics and dimensioned for optimum efficiency. The existing injectors were replaced by LEF injectors, and the flotation pumps were equipped with new LEF impellers. Contractually agreed measurements of the energy consumption before and after the rebuild confirmed the energy savings promised by Voith, which was also documented in a report.
The rebuild is part of an extensive, ambitious energy efficiency program of Steinbeis Papier GmbH. "As a sustainable company in the recycled paper industry, we want to take full advantage of all production possibilities to reduce energy consumption," said Dr. Michael Hunold, production manager at Steinbeis Papier.
TAPPI
http://www.tappi.org/