|
||
Print this article | Send to Colleague Volunteers for the following working groups of Technical Information Papers (TIPs) are needed. All Working Groups of TIPs require a minimum of 3 TAPPI members from 3 different companies in order to review a TIP. The following TIPs need either a Working Group Chair (WGC) to initate the review or additional members of the Working Group (WG): 0304 Process Control & Quality Assurance TIP 0304-24 Calibration and maintenance of the burst tester WGC: James Pauw 0305 Production TIP 0305-54 Material handling considerations for flexo folder gluers WGC: John Buzzell 0402 - Corrosion and Materials Engineering TIP 0402-32 Guidelines for thermal spray coatings installed to prevent corrosion in pulp mill process equipment WGC: Michael Lykin 0416 - Energy, Recovery and Recaust 04/14/2020 - TIP 0416-08 Guidelines for replacement of generating bank tubes with expanded joints in two-drum boilers WGC: Michael Lykin If you would like to join a Working Group of a TIP, please write to tip@tappi.org for more information. |
||
TAPPI Standards guidelines require that all TAPPI members receive notification of any proposed new Standard or TIPs. This message is being sent to you because you are a TAPPI member; have purchased TIPs or Standards products from TAPPI; or because you have previously expressed interest in this topic. |
||
TAPPI is the leading technical association for the worldwide pulp, paper and converting industry. |
||