Listed below are TAPPI TIPs that were submitted to the Working Group for review. Each TIP includes the date when the Work Item was initiated, its assigned Subject Category, and the name of the Working Group Chair (WGC). The target completion date for the review of each TIP is one year after the opening of the Work Item.
0106 - Coating Pigments
July 13, 2023 - TIP 0106-06 Kaolin clay pigment index, WGC: Prakash B. Malla
0304 - Process Control & Quality Assurance
July 22, 2022 - TIP 0304-31 Splicer defects and cures, WGC: Mark Malinowski
July 13, 2023 -TIP 0304-32 Causes and corrections of common corrugator bonding problems, WGC: Mark Malinowski
June 1, 2022 -TIP 0304-47 Corrugator bearing clearance checks and their impact, WGC Needed
January 9, 2023 -TIP 0304-62 Checking the parallel of corrugating rolls with "NCR" paper, WGC: Thomas Staal
October 7, 2022 -TIP 0304-73 Checking for coating wear on corrugating rolls, WGC: John Buzzell
0305 - Production
July 13, 2023 -TIP 0305-53 Machinery considerations and selection: yoked scoring slotting section WGC Needed
0306 - Flexo Printing and Graphics
September 27, 2022 -TIP 0306-15 Identifying anilox volume measuring equipment, WGC Needed
September 27, 2022 -TIP 0306-18 Cleaning anilox rolls: procedures and options, WGC Needed
0408 - Engineering Management
July 27, 2023 -TIP 0408-01 Checklist for a properly planned project WGC: Margaret Gorog
0416 Steam & Power/Energy Management
August 31, 2022 - TIP 0416-06 Keys to successful chemical cleaning of boilers, WGC Needed
November 23, 2021 -TIP 0416-07 Evaluating reverse osmosis for treating makeup to the boiler feedwater in a pulp and paper mill, WGC Needed
April 14, 2020 -TIP 0416-08 Guidelines for replacement of generating bank tubes with expanded joints in two-drum boilers, WGC: Michael Lykins
November 7, 2019 - TIP 0416-13 Water treatment-related opportunities for energy conservation in a paper mill powerhouse, WGC Needed
October 19, 2018 -TIP 0416-20 Recovery boiler sootblowers: practical guidelines, WGC: Danny S. Tandra
July 19, 2023 - TIP 0416-23 Explanation of recovery boiler leak indications, WGC: Chris Jackson
January 30, 2020 - TIP 0416-24 Energy checklist: pulp mill WGC: Mathias Lindstrom
November 7, 2019 -TIP 0416-25 Nitrogen oxide emissions control from biomass and kraft recovery boilers in the pulp and paper Industry, WGC: Ben Bunner
November 7, 2019 -TIP 0416-26 Best practice for recovery boiler inspection (optimizing inspection scope), WGC: Ben Bunner
0418 - Process Engineering
January 15, 2020 - TIP 0418-02 Recausticizing material balance equations relating to digester requirements WGC: Subra Arasakesari
If you would like to participate in the Working Group to review any of these TIPs, please write to tip@tappi.org.