Volunteers for the following working groups of Technical Information Papers (TIPs) are needed.

All Working Groups of TIPs require a minimum of 3 TAPPI members from 3 different companies in order to review a TIP. The following TIPs do not have an assigned Working Group Chair (WGC) to initiate the review:

Working Group Chairs Needed:

TIP 0404-20 Physical characterization of press fabrics: basis weight, air permeability, and pressure uniformity

TIP 0502-20 Catalog of Stock Preparation Pilot Plants

Working Group Members Needed:

TIP 0402-13 Guidelines for specification and inspection of electric resistance welded (ERW) and seamless boiler tube for critical and non-critical service

TIP 0402-18 Ultrasonic testing (UT) for tube thickness in black liquor recovery boilers: Part I - Guidelines for accurate tube thickness testing; Part II - Default layouts for tube thickness surveys in various boiler zones

TIP 0404-20 Physical characterization of press fabrics: basis weight, air permeability, and pressure uniformity

TIP 0502-20 Catalog of Stock Preparation Pilot Plants

If you would like to join a Working Group of a TIP, please write to tip@tappi.org for more information.