‘Super Load’ Valmet Dryer on ‘Slow Crawl’ in Pennsylvania to First Quality Tissue Mill
Print this Article | Send to Colleague
According to PennLive, the “super load” carrying a dryer used in the manufacture of tissue paper has reached Titusville on its more than 300-mile journey to the Lock Haven area. The Valmet dryer was scheduled to arrive at the First Quality tissue plant just outside Lock Haven in late Deecember after an almost week-long journey. Back to Tissue360 Newsletter |