New Certified Contractors/Firms this Quarter:
• Acero Tecnologia S.A de C.V. – QP3
• Amari Painting & Lining – QP1, QP2
• Bilton Welding & Manufacturing – QP3
• Bollinger Shipyards Lockport – QP1
• Lanza Paint Works – QP3
• Morimatsu Heavy Industry – QP3
• Northwest Pipe Company – QP3
• Rainbow, Inc. – QP1
• Raydar, Inc. – QP3
• B Hilton, Limited – QP1
• Sewon Vertex Heavy Industry – QP1, QP3
• Womble Company – QP3
• Zack Painting Company – QP1, QP2
Second Quarter Audit Deficiency Findings:
349 total deficiencies written as a team, 70 major findings and 279 minor findings. A list of those with more than five total occurrences are listed below:
• Craft Worker Assessment 4 Major, 16 Minor (2 CAS related, 1 susp, 1 within time allotted) mostly available proficiency exams
• Tech Resources Library – 2 Major, 10 Minor
• Job Notices – 2 Major, 8 Minor
• QCS Training – 3 Major, 14 Minor
• Personnel Qualifications – 4 Major, 5 Minor – mostly QC training (Lev1)
• Daily Documentation – 7 Major, 31 Minor (Illum 6, DFT/PA2 7, No QCS signoff 5, No Serial # 6)
• Corporate Health and Safety Programs – 6 Major
• Enforcement of Safety Rules – 6 Major
• No deficiencies noted by any auditor conducting inspector spot checks. (21 conducted)
• 3 suspensions issued as a result
• 1 Fatality
If you have not had your 2018 audit, please contact us ASAP to get scheduled! Contact: Brent Miller at (412) 281-2331 x 2209 or bmiller@sspc.org.