TxDOT - September 2010 Tonnage
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for September 8th & 9th. The total tonnage of hot mix being let is 794,906.
# |
COUNTY |
HWY |
DESCRIPTION |
TONNAGE |
1 |
BELL |
US 0190 |
CONSTRUCTION OF TURN LANES |
3,533 |
2 |
BEXAR |
IH 35 |
OVERLAY AND PAVEMENT MARKINGS ON MAINLANES |
21,991 |
3 |
BURNET |
RM 2147 |
REHAB ROADWAY |
8,500 |
4 |
CAMERON |
FM 800 |
DRAINAGE WORK & RECONSTRUCT ROADWAY/ADD SHOULDERS |
3,804 |
5 |
COOKE |
IH 35, ETC |
REHAB US 82 RAMPS AND FRONTAGE ROADS |
21,002 |
6 |
EASTLAND |
SH 6, ETC |
CONSTRUCT URBAN CURB AND GUTTER SECTION |
19,006 |
7 |
ELLIS, ETC |
SH 34, ETC |
REBURBISHING EXISTING TRAFFIC SIGNALS |
13 |
8 |
FORT BEND |
US 59 |
FR, STRS, BASE AND PAVE |
83,267 |
9 |
GALVESTON |
FM 518 |
BASE REPAIR, MILLING AND ACP OVERLAY |
10,215 |
10 |
GONZALES |
SH 0097 |
REHAB EXISTING ROADWAY |
4,775 |
11 |
GUADALUPE |
IH 10 |
OVERLAY & PAVEMENT MARKINGS |
77,495 |
12 |
HARDIN |
US 0069 |
MICROSURFACE AND RE-STRIP |
1,148 |
13 |
HARRIS |
IH 610 |
SHLDR, GORE & FULL DEPTH REPAIR AND RECONSTRUCT DC |
1,994 |
14 |
HARRIS |
FM 1960 |
PLANNING, SEAL COAT, ACP LEVEL-UP & OVERLAY, PAVMRK |
30,617 |
15 |
HAYS |
RM 12 |
INTERSECTION IMPROVEMENTS |
14,984 |
16 |
HAYS |
RM 12 |
IMPROVEMENTS TO INTERSECTION & LOW WATER CROSSING |
11,827 |
17 |
HIDALGO |
US 83, ETC |
OVERLAY |
80,844 |
18 |
HIDALGO |
US 0083 |
POTHOLE AND PAVEMENT REPAIR |
17,141 |
19 |
HOOD |
FM 167 |
INSTALL TRAFFIC SIGNAL AND TURN LANES |
1,388 |
20 |
KAUFMAN |
FM 740 |
REHABILITATE EXISTING ROADWAY |
22,897 |
21 |
LIBERTY |
FM 1960 |
CONSTRUCT RR GRADE SEPARATION STR AND APPROACHES |
11,976 |
22 |
LIMESTONE |
FM 1365 |
RECONST WIDEN C&G ADD TWO LN RDWY CONT LT TURN |
27,878 |
23 |
MADISON |
FM 1452 |
ROADWAY RESTORATION |
54 |
24 |
MONTGOMERY |
FM 1314 |
CONSTRUCT RIGHT TURN LANES, WIDEN ROADWAY |
20,135 |
25 |
NUECES |
FM 2444 |
REHABILITATION OF ROADWAY |
17,478 |
26 |
NUECES |
IH 0037 |
MILL AND INLAY |
1,769 |
27 |
NUECES |
SH 0358 |
MILL AND INLAY |
2,153 |
28 |
PANOLA |
US 59 |
RESTORE SECTIONS |
29,222 |
29 |
POTTER |
US 87 |
OVERLAY (NBL) |
23,077 |
30 |
RANDALL |
FM 1451 |
REPLACE BRIDGE AND APPROACHES |
974 |
31 |
TARRANT |
SP 347 |
REPLACE BRIDGES AND APPROACHES |
1,254 |
32 |
TOM GREEN, ETC |
SL 306 |
ACP OVERLAY AND CENTERLINE RUMBLE STRIPS |
16,490 |
33 |
TRAVIS |
VA |
SITE SPECIFIC SIGNALS |
38 |
34 |
VICTORIA |
FM 1686 |
REHAB ROADWAY |
8,265 |
35 |
WILLIAMSON, ETC |
FM 734 |
PEDESTRIAN AND INTERSECTION IMPROVEMENTS |
1,588 |
36 |
ZAPATA |
US 83 |
REHAB & WIDEN PAVEMENT(SUPER 2) |
42,816 |
37 |
ZAPATA |
US 83 |
REHAB & WIDEN PAVEMENT |
153,298 |
|
|
|
|
|
|
|
|
TOTAL |
794,906 |
|
|