TxDOT - January 2011 Tonnage
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for January 4th & 5th. The total tonnage of hot mix being let is 808,997.
# |
COUNTY |
HWY |
DESCRIPTION |
TONNAGE |
1 |
Angelina |
SH 94, Etc. |
Resurface with PFC |
10,208 |
2 |
Aransas |
PW |
Resurfacing Parking Lot |
570 |
3 |
Bexar |
IH 410 |
Overlay and Pavement Markings |
24,230 |
4 |
Bexar |
IH 10 |
Retaining Wall |
15 |
5 |
Burnet |
RM 1431 |
Mill, Seal, & Overlay |
8,270 |
6 |
Cameron |
FM 313 |
Rehab Outside Lanes and Overlay |
8,684 |
7 |
Childress |
US 287 |
Asphaltic Concrete Pavement Overlay |
11,258 |
8 |
Collin |
FM 543 |
Base Restoration & HMAC Overlay |
39,312 |
9 |
Crockett, Etc. |
IH 10 |
ACP Overlay |
12,140 |
10 |
Dallas |
SH 289 |
Intersection Improvements |
1,477 |
11 |
Denton |
IH 35E, Etc. |
ACP Overlay Mainlanes |
6,320 |
12 |
Denton |
SH 114 |
Construct Interchange at SH 170 |
51,461 |
13 |
Donley |
US 287 |
Asphaltic Concrete Overlay |
29,455 |
14 |
Falls |
FM 147 |
Provide Additional Paved Surface Width |
4,876 |
15 |
Fort Bend |
US 59 |
Realign NB Frontage Road, Extend ML Trench Drains |
4,914 |
16 |
Harrison |
SL 390 |
Rehabilitate Existing Highway |
122 |
17 |
Houston |
FM 230 |
Safety Trt Fixed Obj & Prov Addtn'l Pav Surf Width |
20,965 |
18 |
Jefferson, Etc. |
SH 73, Etc. |
Clean & Seal Joints, BS Repair, OCST |
180 |
19 |
Kaufman |
MR 682 |
Rehabilitate Roadways |
114 |
20 |
King |
US 82 |
Miscellaneous Work |
800 |
21 |
Lamar |
US 271 |
Rehabilitation of Existing Roadway |
20,976 |
22 |
LaSalle |
IH 35 |
Construct Tourist & Visitor Center |
14,376 |
23 |
Leon |
FM 2485 |
Roadway Restoration |
8,503 |
24 |
Llano, Etc. |
SH 71 |
Mill, Seal, Overlay & Centerline Rumble Strips |
38,150 |
25 |
Montague |
US 287 |
Mill and Inlay |
4,901 |
26 |
Montague |
FM 1749 |
Spot Full Depth Repair and Overlay |
15,638 |
27 |
Montgomery |
SH 105 |
Widen for Right Turn Lanes |
2,704 |
28 |
Montgomery |
FM 1314, Etc. |
Base Repair and OCST and Hot Mix |
63,978 |
29 |
Montgomery |
CR |
Replace Bridge |
274 |
30 |
Pecos |
US 285, Etc. |
Construct Overpass |
1,908 |
31 |
Randall |
VA |
Construct New Parking Area |
1,235 |
32 |
Reeves |
IH 20 |
Planning, Hotmix, Pavement Markings |
59,612 |
33 |
Robertson |
FM 391 |
Roadway Restoration |
6 |
34 |
Upshur |
SH 154 Etc. |
Install Left Turn Lane |
439 |
35 |
Washington |
US 290 |
Grading, STructures, Base & Paving |
110,919 |
36 |
Webb |
SL 20 |
Resurface of Existing Highway |
16,294 |
37 |
Williamson |
SH 195 |
Widen GR, STRS 7 Surf |
201,997 |
38 |
Wise |
US 81 |
HMAC Overlay |
11,716 |
|
|
|
|
|
|
|
|
TOTAL |
808,997 |
|
|