The TxDOT highway letting is scheduled for February 8 & 9. The total tonnage of hot mix being let is 653,219.
# |
County |
Hwy |
Description |
Tonnage |
1 |
Austin |
SH 159 |
Asphaltic Concrete Pavement |
31,029 |
2 |
Baylor |
US 82 |
Hot Mix Overlay |
11,392 |
3 |
Bee |
BU 181J |
Mill and Overlay |
5,586 |
4 |
Bexar |
MR 681 |
Pavement Repair |
764 |
5 |
Cameron |
US 77 |
Rehab, Mill, Seal, and Overlay |
7,080 |
6 |
Collin |
FM 1827 |
Base Repair and Level Up |
12,455 |
7 |
Collin |
US 380 |
Widen Exist 4 Lane Div to 6 Lane Div Urban |
4,100 |
8 |
Collin |
FM 177 |
Base Repair and Overlay |
9,319 |
9 |
Coryell |
SH 36 |
Construct Greade Separation |
19,184 |
10 |
Dallas |
SH 180 |
Landscape Development |
44 |
11 |
Dallas |
SH 289 |
Intersection Improvements |
1,477 |
12 |
Dallas |
SH 180 |
Planing, Full Depth Repair, and Overlay |
34,537 |
13 |
Dimmit |
US 83 |
Resurface of Roadway |
13,676 |
14 |
Eastland |
VA |
Mill and ACP |
4,094 |
15 |
Ellis |
US 67 |
Construct Grade-Separated Interchange |
37,067 |
16 |
Hale |
IH 27 |
Bridge Preventative Maintenance |
6 |
17 |
Hidalgo |
FM 2061 |
ACP Overlay Project |
14,935 |
18 |
Hill |
IH 35 |
Reconst & Wdn 4 Ln to 6 Ln Reduc Congest & Safety |
141,653 |
19 |
Jackson |
SH 111 |
Turn Lanes |
2,479 |
20 |
Jefferson |
US 69 |
Illumination & Traffic Signal Maintenance |
20 |
21 |
Kerr |
MR 674 |
Planing and Resurfacing |
677 |
22 |
Kinney |
LP 166 |
Planing, Overlay, and Pavement Markings |
5,927 |
23 |
Lamar |
FM 79, Etc. |
Widen Narrow Roadway to Add Shoulders |
4,307 |
24 |
Lamar |
BU 82-H |
Mill and Overlay |
26,008 |
25 |
Live Oak |
US 281 |
Mill and Overlay |
5,354 |
26 |
Milam |
FM 2095 |
Roadway Restoration |
29 |
27 |
Navarro |
FM 739 |
Resurface & Restore Pavement Structure |
9,344 |
28 |
Orange |
IH 10 |
Restoration of Existing Frontage Roadway |
15,476 |
29 |
Potter |
IH 40, Etc. |
Overlay |
44,979 |
30 |
Sherman |
US 54 |
Mill and Overlay |
28,591 |
31 |
Tarrant |
SH 199 |
GR, BS, and HMAC Overlay |
19,072 |
32 |
Terrell |
RM 2400 |
Upgrade Structure |
2 |
33 |
Travis |
IH 35 |
Mill, Full Depth Repair, and Overlay |
4,776 |
34 |
Webb |
US 59 |
Planing, Overlay, and Pavement Markings |
8,986 |
35 |
Webb, Etc. |
IH 35, Etc. |
Resurface of Existing Highway Southbound |
95,522 |
36 |
Wood |
SH 154 |
Subrd, Wdn, Hot Mix BS, Ocst, Strs & Pv Mk |
9,831 |
37 |
Wood |
FM 14 |
Subgrd Wdn, Hot Mix BS & Surf, OCST, STRS & Pv Mk |
11,886 |
38 |
Wood |
FM 17, Etc. |
Provide Additional Paved Surface Width |
9,984 |
39 |
Young |
SH 114 |
Hot Mix Overlay |
1,571 |
|
|
|
|
|
|
|
|
Total |
653,219 |
|
|
|
|
|
|
|