The TxDOT highway letting is scheduled for May 3 & 4. The total tonnage of hot mix being let is 645,427.
# |
County |
Hwy |
Description |
Tonnage |
1 |
Angelina |
VA |
Concrete joint and pavement repairs |
1,308 |
2 |
Aransas |
SH 35 |
Replace existing bridge & rewk apro |
7,657 |
3 |
Bastrop |
PW |
Repair/reconstruct roads & parking |
9,396 |
4 |
Bexar |
VA |
Construct curb ramps |
30 |
5 |
Bexar |
IH 35 |
Pavement repair |
38,797 |
6 |
Blanco |
US 281 |
Replace bridge & approaches |
2,034 |
7 |
Bowie |
US 67, Etc. |
Install left turn lanes |
338 |
8 |
Brazos |
US 190 |
Construction of exit ramp |
1,239 |
9 |
Brazos, Etc |
SH 21 |
Grading, structures, base & surf |
26,969 |
10 |
Burnet |
SH 29 |
Level up & seal coat |
17,784 |
11 |
Coleman |
US 67 |
Mill & inlay (non-site-specific)(will call) |
10,165 |
12 |
Collin |
FM 545 |
Reconstruct roadway & replace bridge |
2,553 |
13 |
Coryell, Etc. |
US 290 |
Cnstr intchgs & cntng rdwys |
65,233 |
14 |
Dallam |
SS 17 |
New location 2 lane rdwy |
220 |
15 |
Dallas |
IH 30 |
Plan, ACP, overlay, shoulder repair, pvmt mrks |
25,117 |
16 |
Dallas |
SP 244 |
Resurf hwy with FDCPR, novachip, & pvmt mkgs |
5,865 |
17 |
Ellis |
FM 983 |
Replace bridge & approaches |
1,394 |
18 |
Freestone |
IH 45 |
Shoulder widening |
222 |
19 |
Frio |
IH 35 |
Relocate existing ramp & construct NB frontage rd |
3,077 |
20 |
Grayson |
US 75 |
Whitetopping |
147 |
21 |
Harris |
IH 610 |
Reconstruct US 290/IH 610 interchange |
51,711 |
22 |
Harris |
IH 10 |
Repair slope failure |
1 |
23 |
Harris |
IH 45 |
GR, STRS, base, & pave |
122,521 |
24 |
Hays |
RM 967 |
One course surface treatment |
1,000 |
25 |
Hays |
RM 150 |
Seal coat & partial overlay |
14,142 |
26 |
Hays |
SH 21 |
Intersection & safety improvements |
3,305 |
27 |
Hidalgo |
US 281, Etc. |
Overlay (main lanes) |
29,870 |
28 |
Hidalgo |
US 281 |
Overlay |
13,516 |
29 |
Hidalgo |
FM 1426 |
Rehab NB outside ln |
3,241 |
30 |
Hill |
IH 35 |
Construction of a new safety rest area |
17,959 |
31 |
Hood |
FM 2580 |
Replace bridge & approaches |
514 |
32 |
Hunt |
FM 1903 |
Construct concrete intersection |
495 |
33 |
Hunt |
PW |
TCST, HMAC BS, curb & gutter, sdwlk, pv mk |
325 |
34 |
Hunt |
SP 302, Etc. |
Overlay |
3,473 |
35 |
Jackson |
FM 1593 |
Widen roadway to add left turn lane |
1,286 |
36 |
Karnes |
SH 80 |
Overlay roadway & backfill edges |
8,350 |
37 |
Lee, Etc. |
SH 21, Etc. |
Adding shoulders, pavement repair & seal coat |
23,380 |
38 |
Leon |
IH 45 |
Roadway restoration |
5,022 |
39 |
McLennan |
SH 6 |
Repair of base failures |
8,589 |
40 |
Milam |
US 190 |
Plane, inlay & seal of existing roadway |
2,357 |
41 |
Montague |
FM 922 |
Asphalt concrete pavement overlay |
4,693 |
42 |
Navarro, Etc. |
VA |
Upgrd select intersections to current ADA std |
511 |
43 |
Nueces |
SH 358 |
Mill & overlay |
3,940 |
44 |
Nueces |
SH 286 |
Mill & overlay |
2,245 |
45 |
Palo Pinto |
SH 254 |
Gr, bs & pavement |
9,155 |
46 |
Palo Pinto |
US 180 |
Mill & overlay |
5,123 |
47 |
Parker |
US 180 |
Flexible pavement structure repair |
1,891 |
48 |
Rusk |
FM 1251 |
Restoration of existing road |
223 |
49 |
Shelby |
FM 2026 |
Replace bridge & approaches |
4 |
50 |
Shelby |
FM 417 |
Bridge replacement |
620 |
51 |
Smith |
SH 110 |
Overlay |
4,217 |
52 |
Tarrant |
BF 1187C |
Replace bridge |
892 |
53 |
Tarrant |
SH 360 |
Improve traf signal & lengthen left turn lane |
246 |
54 |
Tarrant |
SH 26 |
HMAC overlay |
10,216 |
55 |
Travis |
IH 35 |
Planing, seal coat, ACP overlay & MBGF |
3,895 |
56 |
Travis |
RM 620 |
Install advanced warning, safety lighting, etc |
3,176 |
57 |
Travis |
SH 71 |
Install center turn lane & shoulders |
25,540 |
58 |
Travis |
US 290 |
Install center turn lane & pave shoulders |
8,340 |
59 |
Upshur |
FM 1404 |
Improve intersection |
288 |
60 |
Victoria |
BU 77S |
Asphaltic concrete pavement surfacing |
6,266 |
61 |
Waller |
FM 362 |
ACP o/l, base repair & widen shoulders |
22,790 |
62 |
Williamson |
US 79. Etc. |
Extend ltl & install signal |
1,554 |
|
|
|
|
|
|
|
TOTAL |
|
645,280 |
|
|
|
|
|
|
|
|
|
|
|
|