TxDOT – June 2012 Tonnage
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for June 5th & 6th. The total tonnage of asphalt pavements being let is 962,733.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
ANGELINA
|
US 59, ETC.
|
REPLACE RAILROAD UNDERPASS, CONSTRUCT INTERCHANGE |
50,211
|
2 |
BAYLOR
|
US 277
|
UPGRADE TO 4-LANE DIVIDED FACILITY
|
36,634
|
3 |
BELL
|
US 190
|
PAVEMENT REPAIR
|
4,277
|
4 |
BRAZORIA
|
FM 2611
|
ACP OVERLAY
|
4,032
|
5 |
BRAZORIA
|
CS
|
REPLACE BRIDGE & APPROACHES
|
496
|
6 |
BROWN
|
US 84, ETC.
|
WDN SUBGRADE, BASE, SURF, STR, C&G
|
23,175
|
7 |
BROWN
|
CS
|
CONSTRUCT NEW ROADWAY
|
2,121
|
8 |
CAMERON
|
CS
|
WIDEN TO 4 LANES |
1,780
|
9 |
CAMERON
|
US 77
|
PAVEMENT REPAIR
|
2,825
|
10 |
COLLIN
|
SH 289
|
WIDEN TO 4-LANE URBAN - ULT 6-LANE
|
35,473
|
11 |
COLLIN
|
SH 78
|
WIDEN TO 6-LANE DIVIDED
|
43,273
|
12 |
COLORADO
|
FM 333
|
REPLACE BRIDGE & APPROACHES
|
147
|
13 |
DALLAM
|
US 54
|
REHAB EXIST RDWY & ADD PASSING LANES
|
60,872
|
14 |
DALLAS
|
IH 35E
|
FULL DEPTH REPAIR & ACP OVERLAY
|
27,224
|
15 |
DENTON
|
SH 114
|
WIDEN 2-LANE TO 4-LANE DIVIDED RURAL HIGHWAY
|
27,832
|
16 |
DENTON
|
US 380
|
PAVEMENT WIDENING & THERMOPLASTIC STRIPING
|
2,835
|
17 |
EDWARDS
|
RM 674
|
LRA LEVEL UP
|
3,800
|
18 |
ELLIS
|
US 67
|
CONSTRUCT NEW FRONTAGE ROADS OVER UP RR
|
10,338
|
19
|
ELLIS
|
US 287, ETC.
|
ACP OVERLAY & PAVEMENT MARKINGS
|
61,802
|
20
|
GALVESTON
|
IH 45
|
INSTALL LEFT TURN LANES
|
133
|
21
|
GRAYSON
|
FM 691
|
BASE REPAIR
|
2,745
|
22 |
HARRIS
|
US 90
|
ADD RAMP REVERSAL
|
1,305
|
23 |
HARRIS
|
IH 45
|
ROUTINE MAINTENANCE OF IH 45
|
9,150
|
24 |
HARRIS
|
SH 146
|
CONSTRUCT NB DIRECT CONNECTOR
|
802
|
25 |
HARRIS
|
FM 1960
|
TRAFFIC SIGNAL
|
1,380
|
26 |
HARRIS
|
FM 1485, ETC.
|
INSTALL LEFT-TURN LANES AT 4 LOCATIONS
|
3,031
|
27 |
HARRIS
|
US 59
|
INTERSECTION IMPROVEMENTS
|
208
|
28 |
HARRISON
|
IH 20
|
PLANING, CONC PVMT REPAIR, ACP & PVMT MARKINGS
|
34,862
|
29
|
HAYS
|
FM 2001
|
FULL DEPTH EDGE REPAIR AND 2CRS SEAL
|
16,629
|
30
|
HAYS
|
RM 12
|
INTERSECTION REPAIRS, THIN OVERLAY & PVMT MARK
|
7,265
|
31 |
HIDALGO
|
US 83
|
PAVEMENT REPAIR
|
8,191
|
32 |
HILL
|
SH 22
|
PAVEMENT REPAIR
|
3,818
|
33 |
HOPKINS
|
IH 30
|
ON CALL POTHOLE REPAIR
|
1,200
|
34 |
HUNT
|
US 69
|
ON CALL POTHOLE REPAIR
|
875
|
35 |
JEFFERSON
|
US 69
|
ILLUMINATION & TRAFFIC SIGNAL MAINTENANCE
|
20
|
36 |
JEFFERSON
|
PW
|
RECONSTRUCT PARK ROADS, PULLOUTS & PARKING LOTS
|
1,970
|
37 |
JIM WELLS
|
FM 625
|
HMACP
|
4,760
|
38 |
KENEDY
|
US 77
|
CONSTRUCT OVERPASS
|
30,554
|
39
|
KING
|
US 82
|
WIDENING OF A NON-FREEWAY FACILITY
|
85,778
|
40 |
LAMPASAS
|
FM 2657
|
WIDEN, GRADING, STRUCTURES, BASE, AND SURFACE
|
13,296
|
41 |
MARION
|
US 59
|
GR, BASE, CONC PVMT, SURF TRMT & PAV MRK
|
69
|
42 |
MCLENNAN
|
US 84
|
PLANING, ACP INLAY, LEVEL-UP, BASE REP
|
7,009
|
43 |
MCLENNAN
|
FM 1695
|
WDN, GR, STRS & SURF
|
19,223
|
44 |
MENARD
|
US 83
|
LRA LEVEL UP
|
3,320
|
45 |
MIDLAND
|
IH 20
|
PLANING, HOT MIX, CRACK ATTENUATING MIX & PVMT MRK
|
82,153
|
46 |
MONTGOMERY
|
FM 1097
|
INSTALL LEFT TURN LANES
|
827
|
47 |
NACOGDOCHES
|
FM 225
|
CULVERT REPLACEMENT
|
245
|
48 |
NUECES
|
FM 257
|
REHAB OF AN EXISTING ROADWAY
|
2,004
|
49
|
PARKER
|
IH 20
|
RELOCATE EXIT RAMP
|
3,803
|
50 |
PARKER
|
US 180
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR
|
1,550
|
51 |
POLK
|
US 287
|
RECONSTRUCT & WIDEN PAVEMENT
|
33,141
|
52
|
RED RIVER
|
US 82
|
POTHOLE REPAIR
|
480
|
53
|
SAN PATRICIO
|
SH 188
|
REHAB
|
12,854
|
54
|
SMITH
|
SH 110
|
OVERLAY
|
7,206
|
55
|
TAYLOR
|
IH 20
|
RECONSTR FRTG RDS, RELC RAMPS, ADD TURN-AROUNDS
|
95,149
|
56
|
TITUS
|
US 67
|
UTBHMWC OVERLAY & PAVEMENT MARKINGS
|
3,874
|
57
|
TRAVIS
|
IH 35
|
MILL AND OVERLAY IH 35 FRONTAGE ROAD
|
14,614
|
58
|
WICHITA
|
US 82
|
REPLACE BRIDGE & APPROACHES
|
357
|
59
|
ZAPATA
|
US 83
|
REHABILITATION & WIDEN PAVEMENT (SUPER 2)
|
47,736
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
962,733 |
|
|