TxDOT October 2012 Tonnage
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for October 9th & 10th. The total tonnage of asphalt pavements being let is 996,022.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
ANGELINA
|
SP 339
|
RESURFACE AND WIDEN FOR CTWLTL WITH C&G SECTION
|
13,159
|
2 |
AUSTIN
|
FM 331
|
REPLACE BRIDGE AND APPROACHES
|
256
|
3 |
BEE
|
SH 72
|
REHAB ROADWAY AND ADD PASSING LANES
|
79,919
|
4
|
BELL |
SH 317 |
WIDEN FROM TWO TO FOUR LANES WITH RAISED MEDIAN
|
13,363
|
5
|
BELL
|
US 190
|
WIDEN FROM FOUR TO SIX LANES AND RESURFACE
|
220,662
|
6
|
BRAZORIA
|
SH 288
|
CONSTRUCT TURNAROUND
|
74
|
7
|
BRAZORIA
|
BS 288B
|
REPLACE BRIDGE AND APPROACHES
|
7,104
|
8
|
BRAZORIA
|
BS 35-C
|
SEAL COAT, ACP OVERLAY, & PVMNT MRKS
|
9,872
|
9
|
BURNET
|
SH 71, ETC
|
CONSTRUCT CONTINOUS LEFT TURN LANE
|
2,858
|
10
|
CHAMBERS
|
LP 207
|
OVERLAY EXISTING ROADWAY
|
1,292
|
11
|
COMAL
|
FM 306
|
WIDEN TO PROVIDE TURN LANE
|
11,591
|
12 |
DALLAS
|
US 67
|
FULL DEPTH REPAIR CONC PVMT & HMAC OVERLAY
|
2,359
|
13 |
DALLAS
|
IH 30
|
CONSTRUCT 2 LANE EASTBOUND FRONTAGE ROAD
|
3,672
|
14
|
DALLAS
|
IH 35E
|
FULL DEPTH REPAIR AND ACP OVERLAY OF FRONTAGE RDS
|
12,344
|
15
|
DEWITT
|
SH 72
|
ACP OVERLAY
|
12,451
|
16
|
DIMMIT
|
SH 85, ETC
|
OVERLAY
|
58,939
|
17
|
EASTLAND
|
IH 20
|
CONSTRUCT TWO SAFETY REST AREAS
|
10,362
|
18
|
ECTOR
|
IH 20
|
PAVEMENT REPAIR
|
16,533
|
19
|
EL PASO
|
IH 10
|
INTCHG IMPRV INCL CNSTR DIRECT CONNECT
|
16,669
|
20
|
ELLIS
|
IH 35E
|
REHABILITATE EXISTING SB AND NB FRONTAGE ROADS
|
45,328
|
21
|
FORT BEND
|
US 59
|
GENERAL ROUTINE MAINTENANCE OF US 59
|
5
|
22
|
HARDIN
|
FM 770
|
OVERLAY EXISTING ROADWAY
|
6,651
|
23
|
HARDIN
|
SH 326
|
INLET AND CULVERT REPAIRS
|
3
|
24
|
HARRIS
|
IH 10
|
INTERSECTION IMPROVEMENTS
|
5,354
|
25
|
HARRIS
|
IH 610
|
RECONST US290/IH610 INCLDG IH10 TO US290 OUT DCS
|
21,097
|
26
|
HARRIS
|
FM 529
|
GR, STRS, BASE AND SURF
|
11,076
|
27
|
HAYS
|
RM 967
|
CONSTRUCT TURN LANES
|
1,461
|
28
|
HIDALGO
|
US 83
|
ACP OVERLAY
|
18,041
|
29
|
HOUSTON
|
SH 7
|
REALIGN INTERSECTION
|
4,918
|
30
|
KNOX
|
US 82
|
ASPHLTIC CONCRETE OVERLAY
|
11,605
|
31
|
LASALLE
|
IH 35, ETC
|
OVERLAY
|
80,667
|
32
|
LIBERTY
|
FM 563
|
PROVIDE ADDITIONAL PAVED SURFACE WIDTH
|
30,623
|
33
|
MIDLAND
|
SH 158
|
REHABILITATION OF EXISTING ROAD
|
64,595
|
34
|
MONTGOMERY
|
SH 105
|
WIDEN WB FROM 2 TO 3 LANES
|
271
|
35
|
MONTGOMERY, ETC
|
SH 105
|
TURN LNS,PASS LNS, BS REP,OCST,O/L
|
64,811
|
36
|
NUECES
|
US 77
|
MILL, UNDERSEAL & INLAY
|
5,700
|
37
|
POTTER
|
VA
|
STATEWIDE CURB RAMP PROGRAM
|
280
|
38
|
RANDALL
|
US 60
|
ACP OVERLAY
|
84,837
|
39
|
SUTTON
|
SL 467, ETC
|
REHABILITATE TOWN SECTION
|
10,247
|
40
|
TRAVIS
|
US 290
|
PROVIDE SIGNALIZED INTERSECTIONS
|
10,274
|
41
|
WOOD
|
SH 154
|
ADD SHOULDERS AND REHABILITATE ROADWAY
|
24,699
|
|
|
|
|
|
|
TOTAL |
|
|
996,022 |
|
|