TxDOT November 2012 Tonnage
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for November 1st & 2nd. The total tonnage of asphalt pavements being let is 434,795.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
BANDARA
|
PR 37
|
GRADING, BASE, SURF, PAV MRK, SIGNS
|
1,984
|
2 |
BOWIE
|
US 59
|
PLANING,ACP,CPCD & PAV MRKS
|
3,985
|
3 |
BRAZOS
|
SH 6
|
HMA MILL AND INLAY
|
800
|
4
|
CARSON
|
IH 40
|
REHAB EXISTING ROADWAY
|
45,457
|
5
|
COLLIN
|
FM 455 |
SHLD WDN,BS REP,SEAL,LVL-UP
|
18,135
|
6
|
DENTON
|
US 380
|
STRUCTURES, BASE, PAVEMENT
|
17,603
|
7 |
DENTON |
US 377 |
BASE REP, OV
|
46,851 |
8 |
FORT BEND
|
FM 2977
|
INSTALL LEFT TURN LANES
|
4,835
|
9 |
FORD BEND
|
SH 99
|
GUARDRAIL REPAIR
|
30
|
10
|
FORD BEND
|
MR 668
|
CONTRUCT NEW PARKING LOTS
|
2,638
|
11
|
GALVESTON
|
FM 2004
|
INSTALL TURN LANES
|
562
|
12
|
GRIMES
|
SH 90
|
REHABILITATE EXISTING ROAD
|
21,548
|
13 |
GRIMES
|
SH 30
|
ADDITION OF A LEFT TURN LANE AT CR 175
|
2,735
|
14 |
HARRIS
|
US 45
|
GR, WIDEN STRS & RECONSTR PV
|
23,480
|
15
|
HARRIS
|
US 59
|
RECONSTRUCT FRONTAGE ROAD
|
23,756
|
16 |
KARNES
|
US 181
|
INTERSECTION IMPROVEMENTS
|
10,926
|
17 |
KERR
|
FM 394
|
REHAB ROAD
|
1,101
|
18 |
LEE
|
SH 21
|
ADD SHLDRS., PAV REPAIR, SEAL COAT
|
33,385
|
19
|
LIBERTY
|
FM 1960
|
ACP, STRIPE
|
17,125
|
20 |
LIBERTY
|
FM 686
|
BS, ACP, OCST, STRIPE
|
7,568
|
21
|
MONTAGUE
|
FM 677
|
REHABILITATION OF EXISTING ROADWAY
|
23,261
|
22
|
MONTGOMERY
|
CR
|
REPLACE BRIDGE AND APPROACHES
|
743
|
23
|
NACOGDOCHES
|
VA
|
ADDITION OF TWO LEFT TURN LANES
|
1,034
|
24
|
RANDALL
|
CS
|
REHAB EXISTING ROADWAY
|
4,726
|
25
|
SABINE
|
SH 87
|
PROVIDE ADDL PAV SURF WID & TURN LN
|
7,985
|
26
|
TARRANT
|
SH 199
|
GRADING, DRAINAGE AND STRUCTURE
|
4,468
|
27
|
TARRANT
|
US 287
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR
|
2,450
|
28
|
WALLER
|
FM 3346
|
ACP OVERLAY
|
5,447
|
29
|
WHEELER
|
FM 592
|
WIDENING OF NON-FREEWAY FACILITY
|
41,118
|
30
|
ZAPATA
|
US 83
|
REHAB & WIDEN PAVEMENT (SUPER 2)
|
59,059
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
434,795 |
|
|