TxDOT December 2012 Tonnage
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for December 4th & 5th. The total tonnage of asphalt pavements being let is 670,587.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
BASTROP
|
US 290
|
EXTEND LEFT TURN LANE AT MEDIAN |
205
|
2 |
BAYLOR
|
US 277
|
UPGRADE TO 4 LANE FACILITY |
32,633
|
3 |
BEXAR
|
IH 10
|
RECONST. AND RECONFIGURE INTERSECT.RAMP & FRONTAGE |
2,760
|
4
|
BEXAR
|
IH 35
|
OVERLAY AND PAVEMENT MARKINGS |
6,838
|
5
|
BEXAR
|
IH 10
|
SURF, PAV MARK, BASE REPAIR |
20,532
|
6
|
BLANCO, ETC
|
US 281
|
MILL, SEAL & OVERLAY |
59,258
|
7 |
BRAZORIA
|
FM 523
|
INSTALL LEFT TURN LANES |
1,907
|
8 |
BRAZOS
|
SH 6
|
UPGRADE FREEWAY RAMPS |
45,236
|
9 |
CHEROKEE
|
SH 294, ETC
|
STRS,SUBGRD WDN,ACP BS&LV L-UP,OCST,MBGF,PV MK |
46,094
|
10
|
DALLAS
|
LP 12
|
FULL DEPTH REPAIR, MILL AND ACP OVERLAY |
7,764
|
11
|
DALLAS
|
CS
|
WIDEN 2 TO 4 LN DIV LN) W/GR SEP |
8,214
|
12
|
DALLAS, ETC
|
IH 30, ETC
|
CONSTRUCT MANAGED/HOV LANE GANTRIES W/ RAMPS |
23,973
|
13 |
DICKENS
|
SH 208
|
REHABILITATION OF EXISTING ROADWAY |
9,645
|
14 |
EL PASO
|
LP 375, ETC
|
MILL AND INLAY |
4,120
|
15
|
GREGG
|
US 80
|
WDN,BS,SURF,STM SWR,CLVT EXT,C&G,SFTY IMPRV,SGN,PM |
13,856
|
16 |
GUADALUPE
|
SH 123
|
GRAD, BSE, SURF, PAV'T MRK, SIGNAL |
27,389
|
17 |
HARDEMAN
|
US 287
|
ASPHALTIC CONCRETE PAVEMENT OVERLAY |
29,107
|
18 |
HARRIS
|
US 90A
|
RECONSTRUCT, FULL DEPTH, MILL |
3,352
|
19
|
HARRIS
|
US 290
|
ASPHALT & POTHOLE REPAIR |
100
|
20 |
HAYS
|
RM 12
|
INTERSECTION IMPROVEMENTS |
853
|
21
|
HEMPHILL
|
US 83
|
REHAB EXISTING ROADWAY |
9,673
|
22
|
JACK
|
US 380
|
SEAL COAT |
8,847
|
23
|
KARNES, ETC
|
US 181
|
CONSTRUCT ADDITIONAL PASSING LANES |
43,863
|
24
|
KAUFMAN
|
SH 274
|
BASE REPAIR & LEVEL UP |
1,902
|
25
|
KNOX
|
SH 6
|
ACP WIDENING AND ACP OVERLAY |
31,165
|
26
|
LIVE OAK
|
SH 72
|
WIDEN AND OVERLAY ROADWAY |
13,091
|
27
|
LIVE OAK
|
SH 72
|
CONSTRUCT PASSING LANES |
41,032
|
28
|
LLANO
|
SH 29
|
LEVEL-UP & SEAL COAT |
9,820
|
29
|
LUBBOCK
|
CS
|
GRAD, BASE, C&G, ACP, STR |
5,732
|
30
|
MCCULLOCH
|
SH 71
|
WDN SUBGRADE, STR, SURFACE |
510
|
31
|
MCLENNAN
|
LP 396
|
MICROSURF, REALIGN CURB, WIDEN PAVMNT @ COBBS DR |
45
|
32
|
MIDLAND
|
IH 20
|
REBUILD DRIVING LANES, OVERSEAL |
20,625
|
33
|
MONTAGUE, ETC
|
US 82, ETC
|
OVERLAY |
9,549
|
34
|
MONTGOMERY
|
US 59
|
ASPHALT PAVEMENT REPAIR |
434
|
35
|
REFUGIO
|
US 77
|
MILL,SEAL AND OVERLAY_(NB LANES ONLY) |
25,746 |
36
|
SHELBY
|
US 59
|
REHABILITATE EXISTING PAVEMENT |
23,730 |
37
|
SHELBY
|
FM 711
|
RECONSTRUCT AND WIDEN PAVEMENT |
28,080 |
38
|
TARRANT
|
IH 820
|
HMAC OVERLAY |
28,488 |
39
|
TRAVIS
|
RM 620
|
RESTRIPE, ADD DUAL RTL AND REPL SIGNALS |
1,690
|
40
|
TRAVIS
|
SH 71
|
LEVEL-UP & SEAL COAT |
1,286
|
41
|
WEBB
|
SL 20
|
FLEX BSE, SURF, BRIDGE, PAV MRK ETC |
11,115 |
42
|
WEBB
|
IH0035
|
INSTALL RAISED MEDIAN, SIGNING & STRIPING |
1,690 |
43
|
WICHITA
|
SH 240
|
OVERLAY |
250 |
44
|
WILLACY
|
FM 490
|
REHAB OF EXISTING ROADWAY |
6,396 |
45
|
ZAVALA
|
US 57
|
CONSISTING OF PLANING AND OVERLAY |
1,992 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
670,587 |
|
|