The TxDOT highway letting is scheduled for February 5th and 6th. The total tonnage of asphalt pavements being let is 733,630.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
ANDERSON |
US84 |
PLANING, OCST, ACP SURF, PVMT MRKG |
8,449 |
2 |
ANGELINA |
US69 |
INTERSECTION IMPROVEMENTS |
22,011 |
3 |
BEXAR |
IH37 |
MILL, SURF, SC, OV & PAV MRK |
73,208 |
4 |
BURNET |
SH29 |
ADDING CENTER TURN LANE AND 3' SHLDRS |
2,654 |
5
|
CALHOUN |
FM2143 |
DEMO., STRUCTURAL, BASE, SURFACING |
318 |
6
|
CHAMBERS |
IH10 |
PLANE, MBGF, PFC |
29,879 |
7 |
CHEROKEE |
FM347 |
ACP WIDENING,OVERLAY,AND PAVEMENT MARKER |
5,581 |
8 |
CONCHO |
FM380 |
REMOVE AND REPLACE DRAINAGE STRUCTURE |
111 |
9 |
COOKE |
US82 |
BRIDGE REPLACEMENT |
482 |
10
|
CORYELL |
FM929 |
REPL BR & APPRS |
786 |
11
|
DALLAS |
US80 |
REPAIR SLOPE WITH HEADWALL |
11 |
12
|
DEWITT |
US183 |
CONSTRUCT AUX. LANES FOR SUPER 2 |
67,735 |
13 |
EL PASO |
SS1966 |
CONSTRUCTION OF SPUR |
2,653 |
14 |
ERATH |
FM988 |
MILL, BASE AND HMAC OVERLAY |
7,833 |
15
|
FANNIN |
FM896 |
BASE REHAB |
173 |
16 |
GILLESPIE |
RM783 |
PROVIDE ADDITIONAL PAVED SURFACE WI |
9,769 |
17 |
HARRIS |
CS |
BS REP,PLANING, 2" O/L & PV_MRKS |
27,570 |
18 |
HARRIS |
SP330 |
BS REP, MILLING, & ACP OVERLAY |
9,144 |
19 |
HARRIS |
CS |
WIDEN TO 6 LANE DIVIDED |
978 |
20 |
HARRIS |
IH45 |
TMS IMPRVMTS CONT NB & SB DCS |
1,035 |
21
|
HARRIS |
IH610 |
SEAL COAT, CAM LEVEL-UP, TOM OVERLAY |
7,808 |
22
|
HASKELL |
US277 |
MILLING,SPOT BASE REP & SURFACING |
18,440 |
23
|
HENDERSON |
SH274 |
SUBGRADE WIDEN, LEVEL-UP, OCST |
26,380 |
24
|
HIDALGO |
CR,ETC |
REPLACE BRIDGE & RECONST APPROACHES |
155 |
25
|
HILL |
FM933 |
WDN, GR, STRS & SURF |
22,997 |
26
|
HOUSTON |
FM1280 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
35,090 |
27
|
HOWARD |
MR686 |
PARKING AREA - CURB AND GUTTER |
1,117 |
28
|
HUTCHINSON |
SH136 |
REPLACE BRIDGE AND APPROACHES |
356 |
29
|
JASPER |
FM2799 |
EDGE STABILIZATION |
515 |
30
|
JASPER |
FM254 |
EDGE STABILIZATION |
132 |
31
|
JEFFERSON |
SH82 |
INSTALL FLEX BASE AND ACP OVERLAY |
126 |
32
|
LAMAR |
US82 |
ON CALL MILLING & HOTMIX INLAY |
6,325 |
33
|
LEE |
PW |
PAVE VARIOUS ROADS/PARKING AREAS |
3,945 |
34
|
LUBBOCK |
US62 |
GRD,ACP,CRCP,TREAT SUBGRD,CG,STR OP |
33,981 |
35
|
MADISON |
SH75 |
HMA OVERLAY |
8,280 |
36
|
MCLENNAN |
LP574 |
GR, STRS & SURF |
11,020 |
37
|
MIDLAND |
LP250 |
ROADWAY REHABILITATION |
10,658 |
38
|
MILAM |
US190 |
REHABILITATE EXISTING ROADWAY |
37,023 |
39
|
NACOGDOCHES |
FM2782 |
REHABILITATION OF EXISTING ROAD ACCESS |
2,391 |
40
|
NOLAN |
SH70 |
ACP OVERLAY |
26,558 |
41 |
NOLAN |
BS70G |
REHABILITATION, ACP, SIDEWALKS |
17,969 |
42
|
PALO PINTO |
US180 |
MILL AND OVERLAY |
10,300 |
|
|
|
|
|
43 |
PECOS |
IH10 |
MILL,UNDERSEAL,HMAC,PAV MRKS&MARKER |
16,179 |
44 |
POLK |
US59 |
REHABILITATE EXISTING PAVEMENT |
31,135 |
45 |
POTTER |
US87 |
REPLACE BRIDGE AND APPROACHES |
157 |
46 |
SAN PATRICIO |
IH37 |
MILL, SEAL AND OVERLAY |
27,208 |
47 |
TARRANT |
SH180 |
MILL, PAVT REPAIR AND OVERLAY |
23,903 |
48 |
TARRANT |
SH10 |
GR, BS, PAVEMENT AND TRAFFIC SIGNAL |
664 |
49 |
TARRANT |
SH199 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR |
5,000 |
50 |
TARRANT |
US287 |
BRIDGE REPLACEMENT |
4,765 |
51 |
TAYLOR |
BI20I |
BRIDGE REPLACEMENT |
3,493 |
52 |
TAYLOR |
LP322 |
SPOT BASE RPR,UND SL,OV, MBGF |
29,036 |
53 |
TOM GREEN |
US87 |
ACP OVERLAY |
8,807 |
54 |
TRAVIS |
VA |
CONSTRUCT SIDEWALKS |
111 |
55 |
TRAVIS |
US290 |
INNOVATIVE INTERSECTION IMPROVEMENT |
11,755 |
56 |
TRAVIS |
US290 |
PAVEMENT REPAIR & SEAL COAT |
6,500 |
57 |
TRAVIS |
RM1431 |
ADD LEFT TURN LANE |
69 |
58 |
WILLIAMSON |
FM972 |
PAVEMENT REPAIR & SEAL COAT |
2,222 |
59 |
WISE |
US81 |
HMAC OVERLAY |
10,680 |
|
|
|
|
|
|
TOTAL |
|
TOTAL ALL PROJECT |
733,630 |
|
|