TxDOT June 2013 Tonnage
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for June 4th and 5th. The total tonnage of asphalt pavements being let is 725,823.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
ANGELINA |
FM1475 |
REHAB & WIDEN EXISTING PAVEMENT |
1,765 |
2 |
ANGELINA |
US59 |
CONSTRUCT GRADE SEPARATION |
27,786 |
3 |
ATASCOSA |
IH37 |
MILL,BS,SURF,SC,OV & PAV MRK (SBML) |
19,601 |
4 |
BAYLOR |
FM1790 |
OVERLAY |
7,509 |
5
|
BEXAR |
SP536 |
WIDEN FOR CLTL, BIKE LANES & SDWLKS |
9,930 |
6
|
BEXAR |
IH10 |
GRAD, BS, STR, PVMT MRKG |
10,294 |
7 |
BROWN |
CS |
CONSTRUCT NEW 2 LANE ROADWAY |
2,014 |
8 |
EL PASO |
IH10 |
MILL AND INLAY |
3,253 |
9 |
EL PASO |
FM258 |
ROADWAY REPAIRS |
520 |
10
|
FANNIN |
FM896 |
BASE REHAB |
173 |
11
|
FREESTONE |
PW |
RECONSTRUCT ROADWAYS AND CAMPSITES |
2,439 |
12
|
GALVESTON |
FM518 |
STORM DRAINAGE REPAIR |
632 |
13 |
GALVESTON |
SH87 |
OVERLAY OF FERRY LANDING |
5,971 |
14 |
GILLESPIE |
US290 |
ADD CTL & 4-LANE DIVIDED WITH SHLDR |
15,262 |
15
|
GLASSCOCK |
SH158 |
WIDEN ROADWAY TO 4-LANE UNDIVIDED |
2,673 |
16 |
GRAYSON |
FM691 |
WIDEN NON-FREEWAY |
4,165 |
17 |
HARRIS |
BU290L |
PLANING, SEAL COAT, ACP OVERLAY, PAV MRK |
3,245 |
18 |
HARRISON |
SH154 |
REHABILITATE BRIDGE APPROACHES |
232 |
19 |
HIDALGO |
FM2221 |
WIDEN TO 4 LANE DIVIDED URBAN |
5,572 |
20 |
HIDALGO |
FM681 |
WIDEN TO 4 LANE DIVIDED URBAN |
30,161 |
21
|
HUTCHINSON |
CS |
REHAB EXISTING ROADWAY |
3,425 |
22
|
JEFFERSON |
US69 |
ILLUMINATION,TRAFFIC SIGNALS,ELECTRICAL |
20 |
23
|
JIM HOGG |
FM3073 |
PROVIDE ADDITIONAL PAVED SURFACE |
23,413 |
24
|
KAUFMAN |
FM986 |
GR, BASE, PVMT, PVMT MKGS, SIGNS |
11,846 |
25
|
KING |
SH222 |
WIDENING OF NON-FREEWAY FACILITY |
24,668 |
26
|
LAMAR |
FM195 |
REHABILITATION OF EXISTING ROAD |
8,966 |
27
|
LEE |
US290 |
WIDEN ROADWAY TO ADD TURN LANE |
8,333 |
28
|
LEON |
FM3 |
RESTORE EXISTING ROAD |
599 |
29
|
LIBERTY |
US90 |
GR, BS, STR, PVMT, SIGN |
8,799 |
30
|
LUBBOCK |
FM2255 |
CULVERT AND PAVEMENT REPAIR |
227 |
31
|
LUBBOCK |
SH114 |
UTBHMWC & PAVEMENT MARKINGS |
4,630 |
32
|
MAVERICK |
US277 |
GRADE,BASE,STR,ACP,SURF,SIGN,PAV MK |
37,825 |
33 |
MCLENNAN |
LP396 |
CONSTRUCT LEFT-TURN LANE, DRIVEWAY |
44 |
34
|
MCLENNAN |
SH96 |
BRIDGE PREVENTIVE MAINTENANCE |
144 |
35
|
MONTAGUE |
US287 |
MILL & INLAY |
4,096 |
36 |
MONTGOMERY |
SH105 |
WIDEN WB FROM 2 TO 3 LANES |
271 |
37
|
NAVARRO |
SH31 |
OVERLAY |
125,385 |
38 |
NUECES |
SH286 |
GRADE,BASE,SURF,STRS |
79,683 |
39 |
PANOLA |
SH149 |
GR, BASE, SURFACING & PVMT MARKERS |
3,422 |
40 |
PARKER |
FM113 |
REPLACE BRIDGE AND APPROACHES |
105 |
41 |
POLK |
LP393 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
5,369 |
42 |
POTTER |
US87 |
REPLACE BRIDGE & APPR |
96 |
43 |
STARR |
FM490 |
ROVIDE ADDITIONAL PAVED SURFACE |
19,822 |
44 |
TARRANT |
IH30 |
GR, BS AND SURFACE |
691 |
45 |
TITUS |
SH11 |
GR, BASE, SURFACING & PVMT MARKERS |
186 |
46 |
TRAVIS |
LP1 |
EXTEND JOHNSON CREEK BIKE/PED TRAIL |
112 |
47 |
TRAVIS |
VA |
STATEWIDE CURB RAMP PROGRAM |
51 |
48 |
VICTORIA |
LP463 |
CONSTRUCT 4-LANE OVERPASS |
40,270 |
49 |
WARD |
IH20 |
CONSTRUCT NEW WB OFF RAMP |
4,853 |
50 |
WICHITA |
BU2873 |
ACP OVERLAY |
4,931 |
51 |
WICHITA |
SH79 |
REHABILITATION OF EXISTING ROADWAY |
1,931 |
52 |
WILLIAMSON |
SH195 |
WIDEN GR, STRS & SURF |
129,370 |
53 |
WOOD |
US69 |
GR,STRS,ACP BS & SURF,PVT MRK |
18,943 |
|
|
|
|
|
|
|
|
TOTAL PROJECTS SCHEDULED FOR MAY |
725,823 |
|
|