The TxDOT highway letting is scheduled for September 11-12th. The total tonnage of asphalt pavements being let is 1,097,331.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
BAILEY |
US 84 |
MILL,CEMENT STABILZE TYPEB HOTMIXSM |
126,003 |
2 |
BASTROP |
FM535 |
PROVIDE ADDITIONAL PAVED SURFACE WI |
11,024 |
3 |
BELL |
IH35 |
LEVELUP/SURF |
876 |
4 |
BRAZORIA |
SH35 |
SL,ACP O/L & PV MRKS |
31,157 |
5 |
COLLIN |
FM1138 |
GR, BASE, PVMT, PVMT MKGS, SIGNS |
15,928 |
6 |
COMAL |
IH35 |
SEAL COAT, PFC OVERLAY, & PAV MRK |
38,458 |
7 |
COOKE |
FM902 |
REHABILTATION OF EXISTING ROAD |
15,115 |
8 |
DENTON |
FM423 |
WIDEN TO 6 LANE DIVIDED URBAN |
47,005 |
9 |
FREESTONE |
IH45 |
HMA OVERLAY (REHABILITATION) |
39,979 |
10
|
FRIO |
FM140 |
GR, STR, BASE |
3,785 |
11
|
GALVESTON |
FM517 |
TS IMPRVMT & LT TN LN |
4,817 |
12
|
GRAYSON |
US75 |
WIDEN NON-FREEWAY |
8,635 |
13 |
GREGG |
US80 |
HMAC OVERLAY |
17,000 |
14 |
GRIMES |
SH6 |
FRTG ROADS, U-TURNS AND PED. IMP. |
6,771 |
15
|
HAMILTON |
US281 |
REHAB RDWY & ADD PASS LNS |
47,602 |
16 |
HAMILTON |
US281 |
ADD PASS LNS |
62,197 |
17 |
HARRIS |
IH45 |
CONSTRUCT DIRECT CONNECTOR |
875 |
18 |
HARRISON |
IH20 |
PLANING,CONC PV REP,ACP & PAV MRKS |
32,190 |
19 |
HENDERSON |
FM59 |
SBGR WDN,ACP BS&SURF,OCST,MBGF,SIGN |
56,424 |
20 |
JOHNSON |
FM2331 |
ADDITIONAL PAVED SURFACE WIDTH |
34,717 |
21
|
JOHNSON |
US67 |
GRADING, STRUCTURES, BASE, & SURF |
32,022 |
22
|
JOHNSON |
US67 |
HMAC OVERLAY |
26,476 |
23
|
KENEDY |
US77 |
MILL & OVERLAY N.B. & S.B. ROADWAYS |
76,921 |
24
|
KERR |
SH16 |
GRAD,BASE,EMBANK,STR,SURF & PAV MRK |
9,352 |
25
|
LIVE OAK |
SH72 |
GRADE,BASE,SURF,SRTS |
165,122 |
26
|
LLANO |
SH71 |
UPGRADE TO SUPER 2 & ADD LTL'S |
3,552 |
27
|
LUBBOCK |
SH114 |
UTBHMWC & PAVEMENT MARKINGS |
4,630 |
28
|
MARION |
CR |
REPLACE BRIDGE AND APPROACHES |
258 |
29
|
McLENNAN |
IH35 |
OVERLAY AND MILL AND INLAY |
5,260 |
30
|
POLK |
US59 |
REMOVE X-OVERS & CONST TURN-AROUNDS |
8,748 |
31
|
POLK |
US59 |
IMPROVE GUARDRAIL TO DES STANDARDS |
799 |
32
|
RANDALL |
PR5 |
REPLACE CONCRETE WATER CROSSINGS |
961 |
33 |
SMITH |
SH31 |
GRADING,OCST,STRUCTURES,PVMT MRKGS |
11,848 |
34
|
STARR |
US83 |
OVERLAY (ML BOTH DIRECTIONS) |
74,810 |
35
|
TAYLOR |
US83 |
EXC, EMB, STRS, SURF, & SAFE LIGHT |
9,403 |
36 |
TITUS |
US271 |
ACP SURF, MBGF & PAV MARKS |
7,777 |
37
|
VAL VERDE |
SL79 |
GRADING, BASE, STRUCTURES & SURFACE |
5,193 |
38 |
VICTORIA |
US77 |
CONSTRUCT TURN LANE |
7,074 |
39 |
WHARTON |
US59 |
INTERSECTION IMPROVEMENT |
9,748 |
40 |
WICHITA |
SH258 |
REHABILITATION OF EXISTING ROAD |
36,819 |
|
|
|
|
|
|
|
|
TOTALS SCHEDULED FOR SEPTEMBER |
1,097,331 |
|
|