TxDOT February 2014 Projects
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for February 4-5, 2014. The total tonnage of asphalt pavements being let is .
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
BASTROP |
SH304 |
FULL DEPTH REPAIR, LEVEL-UP & SPOT SEAL |
5,495 |
2 |
BEXAR |
IH35 |
CALL OUT PAVEMENT REPAIR |
16,229 |
3 |
BLANCO |
US281 |
MILL, SEAL AND OVERLAY |
3,788 |
4 |
BRAZOS |
SH6 |
HMA OVERLAY |
9,905 |
5 |
BRAZOS |
SH6 |
HMA MILL AND INLAY |
1,403 |
6 |
CAMERON |
US77 |
OVERLAY MAIN LANES |
19,858 |
7 |
CAMERON |
SH100 |
METAL BEAM GUARD FENCE INSTALLATION |
40 |
8 |
CARSON |
IH40 |
REHAB EXISTING ROADWAY |
27,811 |
9 |
COLLIN |
FM75 |
FLEX PVMT STRUCTURE REPAIR AND OVERLAY |
1,726 |
10
|
COMAL |
BS46C |
BASE, GRAD, STR, SURF & PAV'T MRK |
24,934 |
11
|
COOKE |
FM922 |
RESTORATION |
40,679 |
12 |
COOKE |
VA |
RESTORATION |
70 |
13 |
CULBERSON |
FM21858 |
RECYLED MATERIAL FOR SEAL COAT |
6,897 |
14
|
DENTON |
FM720 |
GR, STRS & PVT |
35,042 |
15 |
EL PASO |
SH20 |
INTERSECTION IMPROVEMENTS |
36 |
16 |
FORT BEND |
IH10 |
GS, ROUNDABOUT, LOOP RDS, OVERLAY |
16,762 |
17 |
GILLESPIE |
SH16 |
THIN OVERLAY |
4,231 |
18 |
GRAYSON |
SH91 |
CONSTRUCT LEFT TURN LANE |
3,239 |
19 |
HARDIN |
SH326 |
ASPHALT PAVEMENT REPAIR |
1,264 |
20
|
HARRIS |
SH6 |
ACCESS MANAGEMENT |
783 |
21
|
HARRIS |
IH45 |
CONSTRUCT DIRECT CONNECTOR |
3,212 |
22
|
HAYS |
SH21 |
CONSTR LEFT TURN LANE ON SH 21 NB |
1,812 |
23
|
HOPKINS |
CR |
BRIDGE REPLACEMENT |
157 |
24 |
HOUSTON |
US287 |
CONSTRUCTION OF STORM SEWER |
675 |
25 |
JASPER |
FM1007 |
ADDING OR WIDENING PAVEMENT |
260 |
26 |
JASPER |
FM252 |
HMA OVERLAY |
6,186 |
27 |
JEFFERSON |
SP215 |
FDR, BS, MILL, OVERLAY |
2,146 |
28 |
JOHNSON |
FM917 |
HMAC OVERLAY |
18,493 |
29 |
LIBERTY |
LP573 |
ACP |
13,048 |
30 |
LUBBOCK |
US84 |
UTBHMWC AND PAVEMENT MARKINGS |
10,183 |
31 |
LUBBOCK |
SH114 |
ACCESS IMPROVEMENTS |
2,755 |
32 |
MONTGOMERY |
US59 |
ASPHALT PAVEMENT REPAIR |
442 |
33 |
NEWTON |
SH87 |
PVMT RPR, OCST, ACP |
18,259 |
34 |
OLDHAM |
IH40 |
OVERLAY |
51,597 |
35 |
ORANGE |
IH10 |
GR, BS, PVMT & STR |
64,000 |
36 |
PANOLA |
SH149 |
CMT TRT EXIST MTL, OCST, ACP, & PM |
13,053 |
37 |
SAN JACINTO |
US59 |
ADD SB FRTG RD & RECONST MAIN LANES |
14,779 |
38 |
SAN PATRCIO |
IH37 |
MILL, SEAL AND OVERLAY |
72,623 |
39 |
SCURRY |
US84 |
EXC,EMB,FL BS,PLANE,MBGF,ACP |
39,555 |
40 |
SHELBY |
US84 |
RECONSTRUCT PAVEMENT |
21,858 |
41 |
TARRANT |
IH30 |
HMAC OVERLAY |
56,517 |
42 |
TOM GREEN |
US87 |
ACP OVERLAY |
19,502 |
43 |
TYLER |
US69 |
BRIDGE JOINT MAINTENANCE |
507 |
44 |
VAN ZANDT |
SH198 |
SBGR WDN,ACP BS,OCST,STRS,PFL PV MK |
27,635 |
45 |
VICTORIA |
US59 |
ACP OVERLAY |
13,528 |
46 |
WALKER |
IH45 |
PERFORMANCE-BASED TOTAL MAINT. OF IH 45 |
12,000 |
47 |
WALKER |
SH30 |
HMA MILL AND INLAY |
1,403 |
48 |
WEBB |
FM1472 |
MILL, ACP OVERLAY, SIGNS, PAV MKS |
66,430 |
49 |
WHARTON |
FM1301 |
ACP OVERLAY |
18,840 |
50 |
WILLIAMSON |
FM685 |
RECONSTRUCT TO 4-LANE DIVIDED RDWY |
26,238 |
|
|
|
TOTALS SCHEDULED FOR FEBRUARY |
818,155 |
|
|