The TxDOT highway letting is scheduled for June 12-13, 2014. Total tonnage of asphalt pavements being let is 1,090,982.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
BAYLOR |
US277 |
OVERLAY |
30,134 |
2 |
BELL |
FM2410 |
ADD TRN LNS |
2,769 |
3 |
BEXAR |
IH10 |
OVERLAY AND PAVEMENT MARKINGS |
54,887 |
4 |
BEXAR |
IH410 |
SLOPE REPAIR, OVERLAY, MBGF, PAV MK |
17,573 |
5 |
BRAZORIA |
CS |
REPLACE BRIDGE AND APPROACHES |
1,280 |
6 |
BRAZORIA |
CR |
REPLACE BRIDGE AND APPROACHES |
54 |
7 |
BURNET |
RM243 |
GUARDRAIL&SAFETY TREAT FIXED OBJCTS |
7,313 |
8 |
CALDWELL |
SH80 |
INSTALL CONTINUOUS TURN LANE |
1,344 |
9 |
CAMERON |
IH69E |
RAMP IMPROVEMENTS |
1,807 |
10
|
COLLIN |
US380 |
GR,DR,STR,PAV,SIGN,PAV MRKS,CON PAV |
61,184 |
11
|
COLLIN |
FM428 |
SHLDR WDN,BS REP,UNDERSEAL,OV |
7,577 |
12 |
COMAL |
IH35 |
GRAD, BASE, STR, PAVMNT MRKNGS |
7,931 |
13 |
CORYELL |
US190 |
BASE REPAIR, UNDERDRAIN AND ACP OVERLAY |
4,479 |
14
|
DALLAS |
CS |
REPL BR & APPRS |
90 |
15 |
DALLAS |
US175 |
MILL, FDR AND ACP OVERLAY |
15,234 |
16 |
DALLAS |
US75 |
GRADING,PAVEMENT,SIGNS,PVMT MKGS |
1,419 |
17 |
DALLAS |
IH635 |
GRADING,STRUCTURING,SURFACING |
2,242 |
18 |
DALLAS |
IH345 |
IH345 ROADWAY AND RETAINING WALL REPAIR |
817 |
19 |
DALLAS |
SH78 |
FDR,MILL,ACP OVERLAY AND PVMNT MRK |
5,564 |
20
|
DENTON |
FM455 |
REPLACE EXISTING BRIDGE AND APPROAC |
3,924 |
21
|
DIMMIT |
FM468 |
BASE REPAIR,ACP OV,SIGNS & PV MRKS |
26,448 |
22
|
FOARD |
SH6 |
REPLACEMENT OF EXISTING BRIDGE |
761 |
23
|
FT. BEND |
FM762 |
INSTALL TURN LANE & IMPROVE SHLDS |
1,028 |
24 |
FRIO |
FM1582 |
GRADE, BASE, SC, SURF, PAVMT MRK |
70,091 |
25 |
GALVESTON |
CR |
REPLACE BRIDGE AND APPROACHES |
168 |
26 |
GRAY |
US60 |
OVERLAY |
22,341 |
27 |
GUADALUPE |
VA |
GRAD, BASE, SURF, STR, SIGN |
21 |
28 |
HARDEMAN |
SH6 |
REHABILITATION OF EXISTING ROADWAY |
36,069 |
29 |
HARDEMAN |
SH6 |
MISCELLANEOUS WORK |
1,955 |
30 |
HARRISON |
CR |
REPLACE BRIDGE AND APPROACHES |
145 |
31 |
HAYS |
SH123 |
MILL, LEVEL-UP, SEAL & THIN OVERLAY |
4,284 |
32 |
HAYS |
US290 |
MILL, SEAL, & THIN OVERLAY |
4,284 |
33 |
HAYS |
SH123 |
CONST GRADE SEPARATION |
33,576 |
34 |
HEMPHILL |
US60 |
WIDENING EXISTING ROADWAY |
1,089 |
35 |
HILL |
FM3050 |
BASE FAILURE PAVEMENT REPAIR |
1,495 |
36 |
HOOD |
FM167 |
GR,BS,DR STRUCTURE & HMAC PAVEMENT |
6,593 |
37 |
JACK |
FM1156 |
REPL BRIDGE AND APPROACHES |
543 |
38 |
JOHNSON |
FM2738 |
SEAL COAT AND OVERLAY |
11,616 |
39 |
KAUFMAN |
FM2728 |
GR, BASE, PVMT, PVMT MKGS, SIGNS |
32,366 |
40 |
KAUFMAN |
FM3039 |
REWORK,CEMENT TR BS,SURF,PVMT MRKGS |
4,771 |
41 |
KENDALL |
SH46 |
GR, BSE, SURF, PAVT MRK |
247 |
42 |
KERR |
SH16 |
R, BSE, SURF, PAVT MRK |
4,759 |
43 |
KLEBERG |
FM1356 |
REHAB AND WIDEN |
3,647 |
44 |
LAMAR |
US82 |
WIDEN NON-FREEWAY |
39,296 |
45 |
LASALLE |
FM624 |
GRAD, BASE, SURF, STRIPING |
11,995 |
46 |
LAVACA |
SH111 |
PAVEMENT REPAIR AND RESURFACING |
24,006 |
47 |
LEE |
US77 |
PAVEMENT REPAIR, LEVEL-UP & SEAL |
1,848 |
48 |
LIMESTONE |
SH7 |
BASE FAILURE PVMNT REPAIR AND ACP O/L |
359 |
49 |
LUBBOCK |
SL289 |
HOT MIX MILL AND INLAY |
6,401 |
50 |
MCLENNAN |
FM2837 |
INTERS IMPRVMT |
3,533 |
51 |
MCLENNAN |
US77 |
PLNG, SURF, ADD PASS LNS |
85,440 |
52 |
MIDLAND |
LP250 |
LANING,HOTMIX,PAVEMENT MARKINGS |
43,804 |
53 |
MONTAGUE |
SH59 |
REHABILITATION OF EXISTING ROAD |
21,750 |
54 |
MONTGOMERY |
FM149 |
INST LT TN LNS |
10,510 |
55 |
MONTGOMERY |
FM2432 |
INSTALL LEFT TURN LANE |
2,051 |
56 |
MONTGOMERY |
CR |
REPLACE BRIDGE AND APPROACHES |
67 |
57 |
NACOGDOCHES |
FM204 |
OCST AND SUPERPAVE |
5,803 |
58 |
NACOGDOCHES |
LP224 |
IMPROVE GUARDRAIL AND SAFETY TREAT |
973 |
59 |
NAVARRO |
SH31 |
FLEXIBLE PAVEMENT STRUCTURE AND OVERLAY |
16,110 |
60 |
PALO PINTO |
FM1821 |
CONSTRUCTION OF RIGHT TURN LANES |
303 |
61 |
PALO PINTO |
SH16 |
PAVEMENT REPAIR AND SEAL COAT |
19,014 |
62 |
PANOLA |
SH43 |
ACP SURF & PAV MKS |
7,304 |
63 |
POTTER |
US87 |
OVERLAY (SB LANES) |
21,381 |
64 |
RANDALL |
US60 |
REPLACE BRIDGE |
123 |
65 |
RED RIVER |
SH37 |
OVERLAY |
17,182 |
66 |
ROCKWALL |
FM551 |
BASE REPAIR, LEVEL UP, OVERLAY |
16,555 |
67 |
SABINE |
FM1 |
SAFETY TREAT FIXED OBJECTS |
822 |
68 |
SABINE |
FM1592 |
SAFETY TREAT FIXED OBJECTS |
1,067 |
69 |
SHELBY |
SH7 |
IMPROVE GUARDRAIL TO DES STANDARDS |
2,264 |
70 |
SMITH |
FM850 |
CRACK SEAL, PLNG, OCST,HMAC LVL-UP |
14,799 |
71 |
TAYLOR |
FM2404 |
FL PAV SPOT RPR, SUPER PAV |
4,360 |
72 |
TAYLOR |
BI20-R |
ACP,DRVWYS,UNDRSL,PLAN,MBGF,BR RAIL |
8,648 |
73 |
TRAVIS |
MR678 |
ROADWAY AND PARKING LOT MAINTENANCE |
575 |
74 |
TRAVIS |
SH45 |
MILL, SEAL & THIN OVERLAY |
6,527 |
75 |
TRAVIS |
LP275 |
RECONST TO 4-LN DIVIDED RDWY |
15,816 |
76 |
TRAVIS |
US290 |
MILL, SEAL & 1.5 INCH OVERLAY |
21,227 |
77 |
UPSHUR |
SH155 |
ACP SURF & PAV MKS |
5,120 |
78 |
UVALDE |
SH127 |
REPLACE BRIDGE AND APPROACHES |
786 |
79 |
VAN ZANDT |
IH20 |
IH 20 TOTAL MAINTENANCE |
9,240 |
80 |
WEBB |
IH35 |
RDWY WIDENING, BLADE LEVEL UP, SPOT BASE |
7,000 |
81 |
WHARTON |
US59 |
RAISE STRUCTURES |
4,322 |
82 |
WICHITA |
IH44 |
REPLACE BRIDGE AND APPROACHES |
117 |
83 |
WILLIAMSON |
IH35 |
OVERLAY NB&SB FRONTAGE ROADS |
47,483 |
84 |
WILLIAMSON |
IH35 |
REPLACE BRIDGE & APPROACHES |
8,657 |
85 |
WILLIAMSON |
FM397 |
PAVEMENT REPAIR & OVERLAY |
5,871 |
86 |
WILLIAMSON |
RM1431 |
CONST DIVERGING DIAMOND INTRSCTN |
12,103 |
87 |
ZAVALA |
US83 |
ACP, OVRLAY, PAV MRK, STRUC, SIGN |
62,451 |
|
|
|
|
|
|
|
|
TOTAL TONNAGE FOR JUNE LETTING |