TxDOT August 2014 Projects
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for August 5-6, 2014. Total tonnage of asphalt pavements being let is 1,015,394.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
ATASCOSA |
SH97 |
GRADE, BASE, SC, SURF, PVMT MRK |
86,690 |
2 |
BEXAR |
IH35 |
GRD, BSE, SURF, PAV T MRKS & SIGNS |
10,794 |
3 |
BEXAR |
IH35 |
MED BARRIER, PAV'T MRKS AND SIGNING |
3,185 |
4 |
BEXAR |
IH35 |
GRD, BSE, SURF, PAV T MRKS & SIGNS |
3,062 |
5 |
BOWIE |
US259 |
REPLACE BRIDGE AND APPROACHES |
4,535 |
6 |
BRAZORIA |
CS |
REPLACE BRIDGE |
5 |
7 |
BURNET |
SH29 |
ADD LEFT TURN LANE |
1,457 |
8 |
CAMERON |
VA |
CONSTRUCT BSIF |
5,696 |
9 |
CAMERON |
FM803 |
REALIGN & WIDEN TO 4 LANES |
24,654 |
10
|
COLLIN |
FM981 |
REPL BRIDGE |
2,020 |
11
|
DALLAS |
SL12 |
INTERSECTION IMPROVEMENT |
3,547 |
12 |
DEWITT |
US87 |
ACP OVERLAY |
38,873 |
13 |
EL PASO |
IH10 |
INTCHG IMPRV INCL CONSTR DIRECT CON |
35,652 |
14
|
EL PASO |
IH10 |
REHAB AND OPERATIONAL IMPROVEMENTS |
9,871 |
15 |
FT. BEND |
IH69 |
GR, STRS, BASE, PAVE & HOV LNS |
95,436 |
16 |
GRAYSON |
US82 |
OVERLAY |
8,100 |
17 |
GRIMES |
SH90 |
REHABILITATE EXISTING ROAD |
14,173 |
18 |
GRIMES |
SH90 |
REHABILITATE EXISTING ROAD |
20,219 |
19 |
HARDIN |
US69 |
GR, BS, ACP, STRIPE |
17,290 |
20
|
HARRIS |
BW8 |
STRS, GR, BASE AND PAVEMENT |
806 |
21
|
HAYS |
RM12 |
IMPROVE/ADD SHOULDERS |
6,897 |
22
|
HENDERSON |
US175 |
RECONSTR GR, STRS, BS, SURF & PAV M |
95,312 |
23
|
HILL |
IH35W |
REHAB RDWY (MILL/INLAY) |
25,762 |
24 |
JACK |
US380 |
MILL AND OVERLAY |
38,775 |
25 |
JOHNSON |
FM916 |
GRADING, BASE AND PAVEMENT |
12,634 |
26 |
LASALLE |
IH35 |
SMA OVERLAY AND PAVEMENT MRK |
16,744 |
27 |
LASALLE |
IH35 |
BRIDGE REHABILITATION |
447 |
28 |
LUBBOCK |
US62 |
GR, BASE, STR, ASB, ACP, CRCP, SS |
71,561 |
29 |
MADISON |
US190 |
REHABILITATE EXISTING ROAD |
40,714 |
30 |
MONTGOMERY |
SH75 |
WID SHOULDERS, BS REPR, OCST & O/L |
51,064 |
31 |
MONTGOMERY |
FM2854 |
INST LT TN LN |
1,066 |
32 |
MONTGOMERY |
FM1774 |
GR, STRS, BS & CONC PAV |
13,606 |
33 |
PALO PINTO |
US281 |
GR,BS,HMAC,DR,STR,BR,SIGN,PVT MK |
10,304 |
34 |
PARKER |
FM51 |
PLANING, HMAC, AND PAV MARKS |
6,626 |
35 |
PARKER |
FM1189 |
GR,STR,FLX BS, SC, MBGF,SIGN,PVT MK |
3,100 |
36 |
PARKER |
IH20 |
GR,HMAC,CRCP,STR,SGN,PVT MK,&SGNLS |
8,091 |
37 |
POTTER |
IH40 |
RELOCATE ENTRANCE AND EXIT RAMPS |
8,076 |
38 |
SAN PATRICIO |
FM1069 |
GR, STRS, BASE, SURF & C&G |
16,402 |
39 |
SMITH |
SH31 |
GR,STRS,ACP BS & SURF,PVT MRK |
28,286 |
40 |
TARRANT |
IH820 |
MILL, HOT MIX OVERLAY, PVT MARKINGS |
7,514 |
41 |
TARRANT |
CS |
REPLACE BRIDGE |
998 |
42 |
TARRANT |
FM1938 |
GR, BS, DR, STRUCTURES & PAVEMENT |
26,295 |
43 |
TARRANT |
FM157 |
GR, BS AND PAVEMENT |
10,408 |
44 |
TRAVIS |
FM973 |
REHAB RDWY, ADD 6' SHOULDERS |
13,280 |
45 |
TRAVIS |
US183 |
REPAIR,MILL,SEAL&OVERLAY FRT RDS |
6,483 |
46 |
WASHINGTON |
SH105 |
MILL/INLAY |
2,366 |
47 |
WILLIAMSON |
FM112 |
DEPTH REPAIR, UNDERSEAL & THIN OV |
8,915 |
48 |
WILLIAMSON |
FM1460 |
CONST 4-LN DIV<L |
83,726 |
49 |
WILLIAMSON |
IH35 |
UPGRADE FRNTGE RDS & RELOCATE RAMPS |
13,494 |
50 |
WISE |
CR |
REPLACE BRIDGE AND APPROACHES |
300 |
51 |
WISE |
CR |
REPLACE BRIDGE AND APPROACHES |
83 |
|
|
|
|
|
|
|
|
TOTAL TONNAGE FOR JULY LETTING |
1,015,394 |
|
|