TxDOT September 2014 Projects
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for September 9-10, 2014. Total tonnage of asphalt pavements being let is 644,781.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
ANGELINA |
BU-59G |
REPLACE EXISTING RR STRUCTURE |
5,325 |
2 |
BASTROP |
SH71 |
CONSTRUCT OVERPASS |
38,484 |
3 |
BOWIE |
FM991 |
REPLACE BRIDGE AND APPROACHES |
403 |
4 |
BURNET |
SH29 |
SEAL COAT,LEVEL UP IN BURNET AND LLANO |
7,970 |
5 |
BURNET |
SH29 |
SEAL COAT AND THIN OVERLAY |
2,707 |
6 |
BURNET |
RM2147 |
ADD LEFT TURN LANE |
4,703 |
7 |
CALDWELL |
US183 |
SEAL & TOM OVERLAY |
2,077 |
8 |
CALHOUN |
FM1289 |
REPLACE BRIDGE AND APPROACHES |
2,222 |
9 |
CAMERON |
FM106 |
GR, STRS & SURF |
27,069 |
10
|
CAMERON |
US281 |
REHAB & WIDEN EXIST ROADWAY SUPER 2 |
21,093 |
11
|
CAMERON |
FM803 |
REALIGN & WIDEN TO 4 LANES |
24,654 |
12 |
DALLAS |
US175 |
GENERAL ROUTINE MAINTENANCE CONTRACT |
11,000 |
13 |
DALLAS |
US175 |
GRADING, STRUCTURES, PVMT, SIGNS |
29,696 |
14
|
DENTON |
FM544 |
REPL BR & APPR |
37,345 |
15 |
DENTON |
FM1385 |
GR, BASE, PVMT, PVMT MKGS, SIGNS |
51,855 |
16 |
EL PASO |
SS601 |
INTERSECTION IMPROVEMENTS |
2,163 |
17 |
EL PASO |
IH10 |
REHAB AND OPERATIONAL IMPROVEMENTS |
9,871 |
18 |
ELLIS |
FM66 |
REPLACE BRIDGE AND APPROACHES |
496 |
19 |
FOARD |
US70 |
REHABILITATION OF EXISTING ROAD |
23,138 |
20
|
GRAYSON |
SH5 |
MISCELLANEOUS CONSTRUCTION |
11,367 |
21
|
HARRIS |
IH45 |
TRANSPORTATION MANAGEMENT SYSTEM |
677 |
22
|
HARRIS |
SH146 |
MILL & O/L |
806 |
23
|
HARRIS |
IH10 |
ACCEL/DECEL LANES WIDENING |
674 |
24 |
HARRIS |
VA |
REP BR APPROACH SLABS |
1,516 |
25 |
HARRISON |
CR |
REPLACE BRIDGE AND APPROACHES |
670 |
26 |
HARRISON |
US59 |
IMPROVE TRAFFIC SIGNAL & LF TRN LAN |
214 |
27 |
HARRISON |
IH20 |
CALLOUT MILL AND INLAY |
11,001 |
28 |
HIDALGO |
US83 |
PAVEMENT REPAIRS |
21,560 |
29 |
HOOD |
US377 |
HMAC OVERLAY |
23,140 |
30 |
HOPKINS |
IH30 |
HAZARD ELIMINATION & SAFETY |
163 |
31 |
HOUSTON |
SH7 |
GRADING, STRUT, BASE, HMAC SURFACE |
22,273 |
32 |
KAUFMAN |
IH20 |
SEAL COAT, PVMT MKGS |
6,944 |
33 |
KAUFMAN |
FM2728 |
GR, BASE, PVMT, PVMT MKGS, SIGNS |
13,963 |
34 |
KENDALL |
IH10 |
BASE, GR, STR, SURF, SIGN & PAV MRK |
11,246 |
35 |
KERR |
SH39 |
REPLACE NARROW BRIDGE & APPROACHES |
374 |
36 |
LIBERTY |
SH61 |
WDN SUBGR, ACP, OCST |
14,808 |
37 |
LIMESTONE |
SH7 |
REHAB RDWY |
26,730 |
38 |
MONTGOMERY |
CR |
REPLACE BRIDGE AND APPROACHES |
1,361 |
39 |
MONTGOMERY |
SH75 |
BASE REPAIR AND ACP O/L |
9,622 |
40 |
MONTGOMERY |
SH105 |
BASE REPAIR AND ACP O/L |
15,400 |
41 |
RAINS |
US69 |
MISCELLANEOUS CONSTRUCTION |
17,696 |
42 |
ROCKWALL |
IH30 |
STR, GRD, BASE & CONC PAVT |
32,810 |
43 |
SAN AUGUSTINE |
SH21 |
INTERSECTION IMPROVEMENTS |
12,871 |
44 |
STARR |
FM755 |
REALIGN/W PARTIAL WIDENING TO 4 LNS |
18,185 |
45 |
TRAVIS |
FM973 |
REHAB RDWY, ADD 6' SHOULDERS |
13,280 |
46 |
WALKER |
SH150 |
GRADING, STRUCTURES, BASE AND SURF |
33,603 |
47 |
WICHITA |
VA |
CONSTRUCT ADA CURB RAMPS |
208 |
48 |
WISE |
FM2264 |
GRADING,BASE,DRAINAGE,STRUCTURE,PAV |
11,938 |
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL TONNAGE FOR SEPTEMBER LETTING |
644,781 |
|
|