TxDOT October 2014 Projects
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for October 7-8, 2014. Total tonnage of asphalt pavements being let is 223,238.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
BEXAR |
VA |
CONSTRUCT CURB RAMPS |
243 |
2 |
CALHOUN |
CR |
REPLACE BRIDGE AND APPROACHES |
406 |
3 |
CALHOUN |
FM1289 |
REPLACE BRIDGE AND APPROACHES |
2,222 |
4 |
CASTRO |
US385 |
LEVELING OR OVERLAY WITH LAYDOWN MACHINE |
942 |
5 |
CLAY |
US287 |
ADDING ACCEL/DECEL LANES |
2,716 |
6 |
EL PASO |
IH10 |
COLLECTOR DISTRIBUTOR LANES |
134,715 |
7 |
FT BEND |
SH6 |
BASE REPAIR, PFC OVERLAY AND PAV MRKS |
6,440 |
8 |
FT BEND |
CS |
GR, STR, BASE AND PAVE |
5,029 |
9 |
HARDIN |
CS |
GR,BS,STR, PVMT |
206 |
10
|
HARRIS |
SH610 |
SLDR REP, PV REP,FULL DEPTH REP,ETC |
8,048 |
11
|
HAYS |
RM1826 |
ADD TURN LANES & SHOULDERS |
2,942 |
12 |
JEFFERSON |
VA |
INSTALL RAILROAD TRACK |
1,138 |
13 |
JOHNSON |
FM1807 |
SEAL COAT OF FC 6 ROADWAYS |
7,357 |
14
|
LAMAR |
US82 |
ON CALL MILL & INLAY |
26,855 |
15 |
LAVACA |
US90A |
REPLACE BRIDGE AND APPROACHES |
2,579 |
16 |
LUBBOCK |
SL0289 |
PM |
4,215 |
17 |
NEWTON |
FM2460 |
FM 2460 PAVEMENT WIDENING |
932 |
18 |
ORANGE |
CR |
GR,BS,STR, PVMT,RR, SIGN |
1,871 |
19 |
RUNNELS |
US83 |
REHABILITATE BRIDGES |
2,374 |
20
|
TARRANT |
IH632 |
MILL AND OVERLAY |
7,557 |
21
|
TRINITY |
SH94 |
SAFETY TREAT FIXED OBJECTS |
1,362 |
22
|
TRINITY |
SH94 |
SAFETY TREAT FIXED OBJECTS |
150 |
23
|
WILLIAMSON |
FM487 |
REHAB RDWY |
2,939 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL TONNAGE FOR OCTOBER LETTING |
223,238 |
|
|