TxDOT February 2015 Projects
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for February 3-4, 2015. Total tonnage of asphalt pavements being let is 549,426.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
BELL |
SL363 |
CNSTR INTCHG |
20,048 |
2 |
BELL |
SH95 |
WDN, GR, BS, SURF & ADD SHLDRS |
56,446 |
3 |
BEXAR |
FM78 |
GR, BASE, SURF, PAVMT MRKRS,SIGNALS |
5,216 |
4 |
BRAZORIA |
CR |
WIDEN FROM 2 TO 4-LANE DIVIDED |
4,647 |
5 |
COOKE |
FM373 |
REPLACE BRIDGE AND APPROACHES |
1,959 |
6 |
COOKE |
CR |
REPLACE BRIDGE AND APPROACHES |
39 |
7 |
DALLAS |
SH78 |
9 INTERSECTION IMPROVEMENTS |
14,104 |
8 |
DENTON |
FM51 |
REPLACE BRIDGE AND APPROACHES |
1,798 |
9 |
DENTON |
SH114 |
GR, STRS & PAVT |
32,765 |
10 |
ECTOR |
US385 |
MILL & INLAY |
3,521 |
11
|
ELLIS |
FM876 |
REPLACE BRIDGE AND APPROACHES |
3,042 |
12 |
FAYETTE |
US290 |
PAVEMENT REPAIR & ACP OVERLAY |
29,913 |
13 |
FT. BEND |
US90 |
BASE REP, ACP O/L AND PAVEMENT MKS |
17,770 |
14
|
HARRIS |
CS |
REPLACE BRIDGE AND APPROACHES |
386 |
15 |
HARRIS |
VA |
CONST CURB RAMPS |
55 |
16 |
HARRIS |
FM1942 |
WIDEN ROADWAY |
967 |
17 |
HAYS |
IH35 |
MILL, SEAL & OVERLAY NB/SB MAINLANE |
14,526 |
18 |
HENDERSON |
SH31 |
PFC,MBGF,CAM,OCST,BKFL,HMAC,PLNG |
23,390 |
19 |
HIDALGO |
BU83 |
DRAINAGE REPAIRS |
45 |
20 |
HILL |
IH35W |
REHAB RDWAY (MILL/INLAY |
26,482 |
21 |
HOWARD |
FM2230 |
EXC,EMB,FL BS,STRS,2 CRSE SURF TRT |
85 |
22 |
HUNT |
FM118 |
REHABILITATION OF EXISTING ROAD |
12,580 |
23 |
KERR |
SH39 |
INSTALL ADV WARNING SIGNALS, ETC |
2,372 |
24 |
LEON |
SH7 |
REHABILITATE EXISTING ROAD |
1,970 |
25 |
LIVE OAK |
IH37 |
SPOT BASE REPAIR AND OVERLAY |
55,107 |
26 |
NACGDCHES |
FM3314 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
1,110 |
27 |
NACGDCHES |
FM1878 |
WIDEN FROM 2 TO 4 LANES AND ADD C&G |
4,020 |
28 |
NUECES |
IH37 |
MILL, SEAL AND OVERLAY |
7,710 |
29 |
OLDHAM |
US385 |
OVERLAY |
9,180 |
30 |
PARKER |
CR |
REPLACE BRIDGE AND APPROACHES |
767 |
31 |
PARKER |
IH20 |
GR, DR, STRUC, AND PAVEMENT |
1,800 |
32 |
PECOS |
FM11 |
REPLACE BRIDGE |
329 |
33 |
ROCKWALL |
FM3549 |
BASE REPAIR, LEVEL UP, OVERLAY |
4,214 |
34 |
TARRANT |
CS |
REPLACE BR & APPRS |
530 |
35 |
TARRANT |
IH30 |
MILL AND OVERLAY |
33,042 |
36 |
TAYLOR |
US84 |
STR,EMB,FB,PLANE,ACP,MBGF,SIGNS |
11,752 |
37 |
TRAVIS |
RM3238 |
ADD SHOULDERS AND LEFT TURN LANE |
4,451 |
38 |
TRAVIS |
SL360 |
PAVEMENT REPAIR, SEAL & OVERLAY |
24,192 |
39 |
TRAVIS |
IH35 |
REPAIR, MILL, SEAL & OVLY MLS |
5,163 |
40 |
VANZANDTUS79 |
IH20 |
ACP BS & SURF, OCST, MICRO, PVT MRK |
14,898 |
41 |
WEBB |
IH35 |
ONE COURSE SURFACE TREAT, PAV MRKS |
65,685 |
42 |
WHARTON |
SH60 |
ACP OVERLAY |
13,775 |
43 |
WICHITA |
US287 |
BRIDGE REPLACEMENT |
2,690 |
44 |
WILLIAMSON |
US79 |
MILL, SEAL & THIN OVERLAY |
11,178 |
45 |
WILLIAMSON |
US183 |
ADD TURN LANES AND SIGNAL |
3,707 |
|
|
|
|
|
|
|
|
TOTAL TONNAGE FOR FEBRUARY LETTING |
549,426 |
|
|