TxDOT March 2015 Projects
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for March 5-6, 2015. Total tonnage of asphalt pavements being let is 1,159,698.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
ANDERSON |
CR |
REPLACE BRIDGE AND APPROACHES |
374 |
2 |
ARCHER |
US281 |
REHABLIITAITION OF EXISTING ROAD |
86,814 |
3 |
ATASCOSA |
IH37 |
R, BASE & PAVEMENT MARKINGS |
24,265 |
4 |
BEXAR |
IH10 |
SLOPE REPAIR |
628 |
5 |
BLANCO |
RM3232 |
PROVIDE ADDITIONAL PAVED SURFACE WI |
3,306 |
6 |
BLANCO |
RM2766 |
PROVIDE ADDITIONAL PAVED SURFACE WI |
5,019 |
7 |
BOWIE |
IH369 |
PAV REP, PLANING, ACP & PAV MRKS |
5,934 |
8 |
BRAZORIA |
SH288 |
CONST SB ON-RAMP & NB OFF-RAMP |
6,792 |
9 |
BRAZOS |
FM60 |
REHABILITATE EXISTING ROAD |
11,744 |
10 |
BROWN |
US67 |
HOT MIX MILL & INLAY |
1,728 |
11 |
CASS |
SH77 |
GR, STR, BASE, C&G, ACP, ILL & PVT |
26,655 |
12 |
CHAMBERS |
IH10 |
GR, BS, OCST, STRIPE |
8,869 |
13 |
COLLIN |
FM2514 |
PVT,DRAINAGE,SIGNS,PVT,MKGS |
12,074 |
14 |
COLLIN |
FM3356 |
FLEXIBLE PVMT STRUCTURE REPAIR & OVERLAY |
1,420 |
15 |
COLORADO |
US90A |
CONSTRUCT SUPER 2 LANES |
51,515 |
16 |
CULBERSON |
RM652 |
OVERLAY MAIN LANES |
45,691 |
17 |
DALLAS |
SH78 |
MILL,CONC,REPAIR & OVERLAY |
18,825 |
18 |
DALLAS |
SL12 |
FDR-CP AND OVERLAY ON FRONTAGE RDS |
7,299 |
19 |
DALLAS |
VA |
CONSTRUCT CURB RAMPS |
48 |
20 |
DELTA |
SH24 |
MILLING & HOTMIX INLAY |
27,730 |
21 |
DENTON |
MR660 |
BASE REPAIR, OVERLAY & UPGRADE PED RAMPS |
660 |
22 |
DEWITT |
SH119 |
RESTORE ROADWAY |
15,733 |
23 |
DIMMIT |
SH85 |
ACP OVERLAY, PAV MRK |
92,017 |
24 |
ELLIS |
FM55 |
GR, BASE, PVMT, PVMT MKGS, SIGNS |
6,248 |
25 |
ELLIS |
US287 |
FLEXIBLE PVMT STRUCTURE REPAIR & OVERLAY |
4,200 |
26 |
ELLIS |
FM664 |
ADD 3-FOOT PAVED SHOULDERS |
56,563 |
27 |
ERATH |
US281 |
BS REPAIR AND HMAC OVERLAY |
11,094 |
28 |
FT BEND |
FM521 |
BS REP, ACP O/L, W/PV MKS |
13,067 |
29 |
GILLESPIE |
SH16 |
MILL, SEAL & THIN OVERLAY |
2,608 |
30 |
GONZALES |
US183 |
ACP OVERLAY |
12,830 |
31 |
HARDIN |
FM943 |
GR, BS, PVMT |
21,113 |
32 |
HARDIN |
US69 |
PLANE AND OVERLAY VARIOUS ROADWAYS |
7,861 |
33 |
HAYS |
SH80 |
MILL, SEAL AND INLAY |
1,906 |
34 |
HENDERSON |
CS |
REPLACE BRIDGE AND APPROACHES |
241 |
35 |
HIDALGO |
BU83S |
OVERLAY |
51,071 |
36 |
JASPER |
FM777 |
FM 777 PAVEMENT WIDENING |
2,969 |
37 |
JEFFERSON |
CR |
STR, BASE, ACP |
539 |
38 |
JOHNSON |
SH174 |
OVERLAY |
14,400 |
39 |
KAUFMAN |
IH20 |
FLEXIBLE PVMT STRUCTURE REPAIR & OVERLAY |
13,294 |
40 |
LAMB |
FM54 |
PLANE, CEM TRT, SURF TRT, HOT MIX |
1,402 |
41 |
LIVE OAK |
IH37 |
GRADE,BASE,SURF |
104,294 |
42 |
LUBBOCK |
US84 |
MILLING, ACP, ONE-COURSE,& STRIPING |
70,207 |
43 |
MADISON |
SH21 |
WIDEN ROADWAY TO SUPER 2 HIGHWAY |
60,525 |
44 |
MAVERICK |
FM1021 |
ACP OVERLAY AND PAVEMENT MARKINGS |
36,276 |
45 |
MONTAGUE |
US82 |
OVERLAY |
41,788 |
46 |
NAVARRO |
FM55 |
FLEXIBLE PAV STRUCTURE REPAIR & OVERLAY |
6,750 |
47 |
NUECES |
IH37 |
MILL, SEAL AND OVERLAY |
7,031 |
48 |
ORANGE |
CS |
GR,BS, STR, PVMT |
597 |
49 |
POTTER |
VA |
CONSTRUCT CURB RAMPS |
35 |
50 |
SAN PATRICIO |
US181 |
OVERLAY ROADWAY |
34,671 |
51 |
SAN PATRICIO |
FM2046 |
MILL, SEAL AND OVERLAY |
4,904 |
52 |
SMITH |
CR |
REPLACE BRIDGE AND APPROACHES |
492 |
53 |
TARRANT |
US377 |
OVERLAY |
21,290 |
54 |
TAYLOR |
SH351 |
FL BS,STRS,PCTB,C&G,SDWLK,DRVWY,SMA |
7,654 |
55 |
TAYLOR |
IH20 |
PLANE,BASE RPR,1CST,ACP OL, & MBGF |
5,020 |
56 |
TOM GREEN |
RM584 |
ACP OVERLAY |
15,989 |
57 |
TRAVIS |
FM1825 |
FULL DEPTH REPAIR, SEAL & OVERLAY |
1,392 |
58 |
TRAVIS |
RM2222 |
MILL, SEAL & OVERLAY |
3,652 |
59 |
TRAVIS |
RM2222 |
CONSTRUCT DUAL LEFT TURN LANE |
1,632 |
60 |
UPSHUR |
SH300 |
CMT TRT BASE, ACP & PVMT MARKINGS |
25,638 |
61 |
WICHITA |
US287 |
MILL & INLAY |
1,632 |
62 |
WICHITA |
SH240 |
REPLACE BRIDGE AND APPROACHES |
181 |
63 |
WILLIAMSON |
CS |
REPLACE BRIDGE & APPROACHES |
204 |
64 |
WISE |
SH114 |
HMAC OVERLAY |
31,298 |
|
|
|
|
|
|
|
|
TOTAL TONNAGE FOR MARCH LETTING |
1,159,698 |
|
|