TxDOT April 2015 Projects
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for April 7-8, 2015. Total tonnage of asphalt pavements being let is 1,236,197.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
ANDERSON |
US79 |
ACP BS & SURF, PVT MRKG |
14,280 |
2 |
ARCHER |
US277 |
WIDEN NON-FREEWAY |
46,641 |
3 |
BASTROP |
VA |
OVERLAY |
4,066 |
4 |
BEE |
US181 |
GRADE,BASE,SURF |
25,454 |
5 |
BEE |
US59 |
MILL, SEAL AND OVERLAY |
2,144 |
6 |
BELL |
US190 |
BASE FAILURE PAVEMENT REPAIR |
6,610 |
7 |
BEXAR |
FM471 |
GR, BASE, SURF |
16,968 |
8 |
BOWIE |
US82 |
GRADING,STRUCTURES,BASE & SURFACING |
638 |
9 |
BRAZORIA |
SH332 |
ACP OVERLAY AND PAVEMENT MARKINGS |
2,825 |
10 |
BRAZORIA |
SH288 |
FLEXIBLE PAVEMENT REPAIR |
250 |
11 |
BRAZORIA |
FM523 |
OCST, RBL AND ACP O/L |
51,879 |
12 |
BRAZORIA |
SH332 |
PV REP, MILL, BS REP, O/L, PV MKS |
28,363 |
13 |
BROWN |
US84 |
PLANE, ACP OVERLAY |
50 |
14 |
CALDWELL |
VA |
REPAIR & RESURFACE ROADWAY |
2,722 |
15 |
COLORADO |
US90A |
ACP OVERLAY |
41,533 |
16 |
CORYELL |
US190 |
BASE FAILURE PAVEMENT REPAIR |
3,317 |
17 |
DALLAS |
SS348 |
FDR-CP |
2,459 |
18 |
DALLAS |
SH289 |
MILL,CONC REPAIR & OVERLAY |
10,474 |
19 |
DENTON |
PW |
REHABILITATE ROADS |
14,383 |
20 |
DIMMIT |
US83 |
ACP OVERLAY, PAV MRKS |
49,540 |
21 |
ECTOR |
IH20 |
EXTEND ON/OFF RAMPS |
25,668 |
22 |
ECTOR |
IH20 |
EXTEND ON/OFF RAMPS |
23,224 |
23 |
FRIO |
FM117 |
WIDEN ROADWAY TO ADD LEFT TURN LANES |
3,832 |
24 |
GALVESTON |
FM1765 |
ACP OVERLAY |
1,500 |
25 |
GALVESTON |
IH45 |
SC, CAM & TOM |
24,748 |
26 |
GALVESTON |
FM517 |
ACP OVERLAY |
5,473 |
27 |
GALVESTON |
FM1765 |
ACP OVERLAY |
6,850 |
28 |
GALVESTON |
SH3 |
ACP OVERLAY |
1,151 |
29 |
GALVESTON |
IH45 |
TRACKLESS TACK, 1" TOM-F & 1" O/L T |
24,530 |
30 |
GALVESTON |
FM646 |
ACP OVERLAY |
4,470 |
31 |
GALVESTON |
IH45 |
CAM & TOM O/L |
26,320 |
32 |
GALVESTON |
LP197 |
ACP OVERLAY |
8,871 |
33 |
GLASSCOCK |
US87 |
ACP OVERLAY |
106,392 |
34 |
GRIMES |
FM244 |
INCREASE SUPERELEVATION |
1,881 |
35 |
HARRIS |
SP501 |
BASE REPAIR, OVERLAY AND STRIPING |
2,551 |
36 |
HARRIS |
SH35 |
ASPHALTIC CONCRETE PAVEMENT OVERLAY |
5,785 |
37 |
HARRISON |
FM31 |
CEMENT TRT,FL BS,SURF & PAV MARKS |
2,420 |
38 |
HARRISON |
IH20 |
REPLACE BRIDGE AND APPROACHES |
2,898 |
39 |
HAYS |
RM12 |
ADD CENTER TURN LANE AND SHOULDERS |
9,271 |
40 |
HENDERSON |
US175 |
RECONSTR GR, STRS, BS, SURF & PAV M |
69,762 |
41 |
HIDALGO |
VA |
CONSTRUCT CURB RAMPS |
130 |
42 |
HILL |
RM2959 |
BASE FAILURE PAVEMENT REPAIR |
975 |
43 |
HOUSTON |
SH21 |
RECONSTRUCT AND ADD PASSING LANES |
24,302 |
44 |
HOWARD |
MR686 |
PARKING AREA AND ROADWAY REPAIRS |
418 |
45 |
KAUFMAN |
SH34 |
PROFILE PAVEMENT MARKINGS |
8,520 |
46 |
KAUFMAN |
FM688 |
SPT BS REP,MILL,LVLUP,OV PAV MRKS |
7,018 |
47 |
KLEBERG |
BU77V |
SPOT BASE REPAIR & NOVACHIP |
4,677 |
48 |
KNOX |
US277 |
REHABILITATION OF EXISTING ROAD |
15,823 |
49 |
LAVACA |
US77 |
ACP OVERLAY |
11,699 |
50 |
LEE |
SH21 |
INSTALL CONTINUOUS TURN LANE |
2,985 |
51 |
LEE |
FM180 |
PROVIDE ADDITIONAL PAVED SURFACE WI |
11,715 |
52 |
LIVE OAK |
IH37 |
NOVACHIP ROADWAY |
29,981 |
53 |
LLANO |
SH71 |
MILL, SEAL AND OVERLAY |
29,981 |
54 |
MARION |
US59 |
PLANING,ACP,CPCD & PAV MRKS |
2,803 |
55 |
McLENNAN |
SH6 |
BASE FAILURE PAVEMENT REPAIR |
10,717 |
56 |
McLENNAN |
FM1637 |
WDN GR, STRS & SURF |
107,358 |
57 |
MIDLAND |
IH20 |
EXTEND ON/OFF RAMPS |
32,812 |
58 |
MIDLAND |
IH20 |
EXTEND ON/OFF RAMPS |
37,626 |
59 |
MONTGOMERY |
FM3083 |
BASE REPAIR AND ACP O/L |
30,333 |
60 |
NUECES |
IH37 |
MILL, UNDERSEAL AND OVERLAY |
29,182 |
61 |
POLK |
FM1988 |
REPLACE BRIDGE AND APPROACHES |
1,199 |
62 |
RANDALL |
SL335 |
CONVERT NON-FREEWAY TO FREEWAY |
14,138 |
63 |
RANDALL |
PR5 |
REPLACE CONCRETE WATER CROSSINGS |
968 |
64 |
SAN PATRICIO |
IH37 |
MILL,SEAL AND OVERLAY |
14,138 |
65 |
SMITH |
SL323 |
BS RPR,MILL & INLAY,LVL-UP,OCST,PFC |
19,264 |
66 |
TAYLOR |
FM1750 |
SPOT REPAIR,SPOT LEVEL-UP,SEAL & OV |
14,395 |
67 |
TRAVIS |
US290 |
REPLACE BRIDGE |
1,452 |
68 |
TRAVIS |
FM812 |
MILL & OVERLAY |
2,842 |
69 |
TRAVIS |
RM2222 |
MILL & OVERLAY |
3,500 |
70 |
TRAVIS |
RM2222 |
MILL & OVERLAY |
1,857 |
71 |
TRAVIS |
SL343 |
MILL, SEAL AND INLAY |
1,370 |
72 |
VAL VERDE |
US277 |
THIN OVERLAY, PAV MRK |
17,051 |
73 |
VICTORIA |
US59 |
ACP OVERLAY |
17,576 |
74 |
WICHITA |
IH44 |
RESTORATION |
4,904 |
75 |
WICHITA |
FM171 |
REHABILITATION OF EXISTING ROADWAY |
22,555 |
76 |
WILBARGER |
CR |
REPLACE BRIDGE AND APPROACHES |
240 |
77 |
WILLIAMSON |
SH45 |
CONST. SPLIT DIAMOND INTERSECTION |
4,124 |
78 |
WILLIAMSON |
RM620 |
MILL & OVERLAY |
1,951 |
79 |
WILLIAMSON |
SS26 |
PAVEMENT REPAIRS, OVERLAY & PAV MARKINGS |
4,108 |
80 |
WILLIAMSON |
US183 |
CONSTRUCT LEFT TURN LANE |
3,567 |
81 |
WILLIAMSON |
FM1063 |
REPLACE BRIDGE |
183 |
82 |
WILLIAMSON |
FM3406 |
WIDEN TO 5-LANE WITH CENTER LTL |
7,316 |
83 |
YOUNG |
CR |
REPLACE BRIDGE AND APPROACHES |
83 |
|
|
|
TOTAL TONNAGE FOR APRIL LETTING |
1,236,197 |
|
|