TxDOT November 2015 Projects
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for November 3-4, 2015. The total tonnage for November is 1,117,276.
# |
COUNTY |
HWY |
TYPE |
TONS |
1 |
AUSTIN |
FM 1094 |
SAFETY TREAT FIXED OBJECTS,WIDEN SH |
2,052 |
2 |
COLLIN |
US 75 |
STR, PVMT, SIGNS, PVMT MKGS |
15,660 |
3 |
DALLAS |
CS |
REHAB BRIDGE AND APPROACHES |
89 |
4 |
DENTON |
FM 156 |
WIDEN |
48,415 |
5 |
DONLEY |
US 287 |
ASPHALTIC CONCRETE PAVEMENT OVERLAY |
53,815 |
6 |
EL PASO |
SL 375 |
IMPROVE CONNECTIVITY AT FMSP |
1,384 |
7 |
ELLIS |
FM 66 |
REPLACE BRIDGE AND APPROACHES |
1,102 |
8 |
FREESTON |
US 79 |
WIDEN ROADWAY TO SUPER 2 HIGHWAY |
48,349 |
9 |
HARRIS |
SL 8 |
TRANSPORTATION MANAGEMENT SYSTEM |
3,379 |
10 |
HARRIS |
FM 1876 |
PLANING, SEAL COAT, OL & PV MKS |
5,920 |
11 |
HAYS |
FM 2439 |
MILL, SEAL & OVERLAY |
1,289 |
12 |
HIDALGO |
SH 336 |
MEDIANS WITH LANDSCAPING |
10,752 |
13 |
HIDALGO |
IH 2 |
FOR COMPLETION: 610 WORKING DAYS |
80,824 |
14 |
HIDALGO |
SH 364 |
GRADING, STRUCTURES & SURFACING |
16,368 |
15 |
HOPKINS |
IH 30 |
MISCELLANEOUS CONSTRUCTION |
15,287 |
16 |
MATAGORDA |
FM 457 |
ADD SHOULDERS |
5,141 |
17 |
MIDLAND |
FM 1788 |
BASE,HOTMIX,SEAL COAT,SIGNS&PAVMRKS |
21,694 |
18 |
NAVARRO |
SH 31 |
GR STRS BASE & SURF |
238,434 |
19 |
NUECES |
SH 44 |
NOVACHIP ROADWAY |
7,231 |
20 |
NUECES |
SH 44 |
LEVEL UP, UNDERSEAL AND OVERLAY |
39,130 |
21 |
NUECES |
SH 44 |
PLANE, SEAL AND OVERLAY |
13,214 |
22 |
ORANGE |
IH 10 |
GR, BS, PVMT, SIGN, STRIPE |
13,375 |
23 |
REFUGIO |
US 183 |
GRADE,BASE SURF |
39,073 |
24 |
SHELBY |
US 96 |
PLANE EXISTING SURFACE AND OVERLAY |
12,500 |
25 |
STEPHENS |
US 180 |
BASE OVERLAY,2CST,ADD PASSING LANES |
200 |
26 |
TARRANT |
IH 30 |
GR STRS & SURF |
152,799 |
27 |
TRAVIS |
IH 35 |
OPERATIONAL IMPROVEMENTS |
149,714 |
28 |
TRAVIS |
RM 2244 |
CONST 4-LN URBAN RDWY W/ CONT LTL |
31,894 |
29 |
TRAVIS |
US 183 |
OVERLAY |
4,928 |
30 |
VICTORIA |
FM 1432 |
RESTORE ROADWAY |
10,250 |
31 |
WASHINGTON |
SH 36 |
WIDEN TO 4-LANE DIVIDED ROADWAY |
24,293 |
32 |
WHARTON |
US 59 |
CONSTRUCT FRONTAGE RO025809111 |
48,721 |
|
|
|
|
|
|
|
|
TOTAL TONNAGE FOR NOVEMBER 2015 |
1,117,276 |
|
|