TxDOT February 2016 Projects
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for February 9-10, 2016. The total tonnage for February 1,334,380.
# |
COUNTY |
HWY |
TYPE |
TONS |
1 |
BEXAR |
MR 681 |
MAINTENANCE EXISTING ROADS AND PARKING |
429 |
2 |
BEXAR |
SL 13 |
SURFACE & PAVEMENT MARKINGS |
23,020 |
3 |
BEXAR |
US 281 |
MILL, SC, PFC OV & PAVMENT MARKINGS |
56,915 |
4 |
BOSQUE |
SH 6 |
UNDERSEAL/LEVELUP/OVERLAY |
84,136 |
5 |
BRAZORIA |
FM 521 |
PAVEMENT REP AND OVERLAY |
12,240 |
6 |
BRAZORIA |
SH 288 |
PV REP, SC, ACP OL AND PV MKS |
39,956 |
7 |
BROWN |
US 84 |
RAILROAD BRIDGE REPLACEMENT |
5,826 |
8 |
CALLAHAN |
SH 36 |
PLAN,FLEX PAV STR RPR,SUPER PAV ACP |
29,403 |
9 |
COMAL |
IH 35 |
SEAL COAT, PFC OVERLAY, PAVMT MRK |
37,725 |
10 |
COOKE |
US 82 |
REHABILITATION OF EXISTING ROAD |
575 |
11 |
DALLAS |
US 175 |
GRADING, STRUCTURES, PVMT, SIGNS |
29,696 |
12 |
DALLAS |
IH 30 |
GR,DRN,RET WLS,CONC PAV,SIG,PV MRKS |
6,886 |
13 |
DEAF SMITH |
US 385 |
RESTORATION |
83,386 |
14 |
FORT BEND |
FM 2759 |
BASE REPAIR,WIDENING,OVERLAY,PAV MRKS |
1,703 |
15 |
FORT BEND |
US 90A |
BASE REP AND OVERLAY |
28,749 |
16 |
HARRIS |
SL 8 |
CONSTR CR ATTENUATING MIX W/ O/L |
674 |
17 |
HARRIS |
FM 1960 |
MILL & ACP OVERLAY |
31,080 |
18 |
HENDERSON |
FM 317 |
ROADWAY REHAB |
350 |
19 |
HUNT |
SH 24 |
ROADWAY WIDENING |
402 |
20 |
HUNT |
FM 1570 |
OVERLAY |
13,346 |
21 |
JEFFERSON |
SH 87 |
GR,BA,OCST,ACP,JOINT SEAL |
12,821 |
22 |
JEFFERSON |
US 90A |
MILL AND OVERLAY VARIOUS ROADWAYS |
5,891 |
23 |
JOHNSON |
SH 174 |
MILL AND OVERLAY |
25,780 |
24 |
KENDALL |
SH 46 |
MILL, SC, SURF, PAV'T MRKINGS |
4,590 |
25 |
LASALLE |
IH 35 |
PLANING, SBR, OVERLAY & PAV MRKS |
5,308 |
26 |
LASALLE |
IH 35 |
ACP, OVERLAY, PAV MARK |
43,452 |
27 |
LIMESTONE |
SH 171 |
UNDERSEAL/OVLY |
31,374 |
28 |
LUBBOCK |
US 84 |
GR,BASE,ACP,STR,OVERPASS,PAV MRK |
34,449 |
29 |
MASON |
SH 71 |
FULL DEPTH,LEVEL UP/MILL,SEAL COAT &OVER |
14,833 |
30 |
MCLENNAN |
SH 6 |
BASE FAILURE PAVEMENT REPAIR |
9,370 |
31 |
MEDINA |
US 90A |
DRAINAGE IMPROVEMENT |
105 |
32 |
MONTGOMERY |
SH 105 |
PLANING, BASE REP, OCST, HOT MIX |
15,167 |
33 |
MONTGOMERY |
FM 2978 |
GR, STRS, BASE AND PAVE |
23,099 |
34 |
MOORE |
SH 151 |
RESTORATION |
101,255 |
35 |
NACOGDOCHES |
US 59 |
UPGRADE BRIDGE AND APPROACH RAILING |
575 |
36 |
NAVARRO |
FM 3096 |
FLEXIBLE PAV STRUCTURE RPR AND OVERLAY |
12,500 |
37 |
NEWTON |
FM 1012 |
REPLACE BRIDGE AND APPROACHES |
136 |
38 |
NUECES |
US 77 |
MILL, SEAL, AND OVERLAY |
8,451 |
39 |
NUECES |
IH 37 |
MILL, SEAL & OVERLAY |
7,273 |
40 |
ORANGE |
IH 10 |
REHABILITATE EXISTING TRUCK AREA |
817 |
41 |
PANOLA |
FM 317 |
CMT TRT EXIST MTL, OCST, ACP, & PM |
8,153 |
42 |
PANOLA |
FM 123 |
CMT TRT BASE, ACP & PVMT MARKINGS |
18,479 |
43 |
PAMER |
US 60 |
MILL, TY B MIX, AND SMA |
87,379 |
44 |
POLK |
US 190 |
SAFETY TREAT FIXED OBJECTS |
1,750 |
45 |
REEVES |
IH 10 |
THIN OVERLAY MIX AND PAVEMENT MARKINGS |
9,884 |
46 |
ROCKWALL |
IH 30 |
STR, GRD, BASE & CONC PAVT |
32,481 |
47 |
RUSK |
SH 43 |
SURF TREAT,ACP SURF,MBGF,PVMT MRKG |
27,956 |
48 |
SAN JACINTO |
US 59 |
HMA LEVEL-UP AND PFC SURFACE |
21,566 |
49 |
SHERMAN |
US 54 |
OVERLAY |
70,550 |
50 |
TARRANT |
SH 26 |
GRADING, BASE,DRAINAGE AND PAVEMENT |
43,876 |
51 |
TOM GREEN |
US 87 |
ACP OVERLAY |
9,536 |
52 |
TRAVIS |
VA |
MILL AND OVERLAY |
807 |
53 |
TRAVIS |
FM 734 |
GR, BASE, ACP, SGNL_& PVMT MKS |
495 |
54 |
TRAVIS |
SL 13 |
OVERLAY FRONTAGE ROADS |
2,412 |
55 |
WALLER |
IH 10 |
BASE REP, PLANING, SURF TREAT, OL |
38,341 |
56 |
WHARTON |
US 59 |
PAVEMENT REPAIR & ACP OVERLAY |
30,846 |
57 |
WILSON |
US 181 |
GRAD, BSE, SURF, PAVMT MRK |
73,924 |
58 |
WISE |
FM 2123 |
GRADING,BASE,DRAIN.STRUCT. AND PAVE |
11,006 |
59 |
WOOD |
US 69 |
MEDIAN CROSS OVER |
1,196 |
|
|
|
|
|
|
|
|
TOTAL |
1,334,380 |
|
|