The TxDOT highway letting is scheduled for March 3-4, 2016. The total tonnage for February 693,452.
# |
COUNTY |
PROJECT |
DESCRIPTION |
TONS |
1 |
BELL |
US
190 |
BASE
FAILURE PAVEMENT REPAIR |
11,732 |
2 |
BEXAR |
IH
35 |
EMERGENCY
SLOPE REPAIR |
140 |
3 |
BEXAR |
IH
35 |
MILL,
SC, SURF, PAV'T MRKINGS |
32,696 |
4 |
BRAZORIA |
FM
518 |
PAVEMENT
REP AND OVERLAY |
43,185 |
5 |
CALDWELL |
SH
21 |
REPAIR,
LEVEL-UP, WIDEN AND OVERLAY |
12,952 |
6 |
CAMERON |
SH
100 |
INSTALL
WILDLIFE CROSSINGS |
1,539 |
7 |
COLLIN |
SH
5 |
MILL,
BS REP, OV |
27,484 |
8 |
COLLIN |
FM
546 |
GR,
PVMT, STR, SIGNS, PVMT MKGS |
24,577 |
9 |
COOKE |
FM
922 |
REHABILITATION
OF EXISTING ROAD |
659 |
10 |
CORYELL |
US
190 |
MILL/INLAY |
14,805 |
11 |
CROCKETT |
IH
10 |
OVERLAY |
43,928 |
12 |
DALLAS |
US
80 |
GR,
PVMT,ACP,BASE |
7,650 |
13 |
DUVAL |
SH
44 |
BASE,
GRADE, SURF TRT, PAV MRK |
11,693 |
14 |
FALLAS |
SH
14 |
BASE FAILURE PAVEMENT REPAIR |
15,068 |
15 |
FREESTONE |
US
84 |
HMA
OVERLAY |
36,378 |
16 |
HIDALGO |
SH
107 |
REHABILITATE
EXISTING ROADWAY |
11,708 |
17 |
HILL |
US
77 |
BASE
FAILURE PAVEMENT REPAIR |
1,338 |
18 |
HOOD |
US
377 |
BS
REPAIR, SEAL COAT AND HMAC |
30,174 |
19 |
HOPKINS |
IH
130 |
OVERLAY |
15,486 |
20 |
LAMAR |
US
82 |
INSTALLING
EDGE DRAINS |
195 |
21 |
LEE |
US
77 |
LEVEL-UP
SEAL COAT & OVERLAY |
6,410 |
22 |
LIMESTONE |
FM
2705 |
DRAINAGE
CONSTRUCTION |
4 |
23 |
McLENNAN |
SH
6 |
MILL/SEAL/INLAY |
26,260 |
24 |
NUECES |
SH
358 |
NOVACHIP |
24,030 |
25 |
NUECES |
SH
361 |
GRADE,BASE,SURF,STRS,STORM
SEWER |
12,931 |
26 |
ROCKWALL |
SH
66 |
GR,
BASE, PVMT, PVMT MKGS, SIGNS |
110,795 |
27 |
SAN
PATRICIO |
US
77 |
MILL,SEAL
AND OVERLAY |
19,610 |
28 |
SHELBY |
FM
417 |
RECONSTRUCT
AND WIDEN PAVEMENT |
333 |
29 |
SMITH |
CR |
REPLACE
BRIDGE & APPROACHES |
775 |
30 |
SMITH |
US
271 |
PLNG,BR
JNT RPR,ACP LVL UP,SURF TRT |
29,394 |
31 |
SMITH |
IH
20 |
TBPFC,ACP,PL,TXT,
BR JNTS,PVMT MKGS |
6,581 |
32 |
STARR |
US
83 |
CONSTRUCT
DRAINAGE OUTFALL |
100 |
33 |
TARRANT |
SH
180 |
MILL
AND OVERLAY |
33,119 |
34 |
TAYLOR |
US
83 |
INSTALL
MBGF AND PAVEMENT MARKINGS, ETC |
66 |
35 |
TRAVIS |
FM
969 |
MILL,
SEAL & TY D OVERLAY |
12,397 |
36 |
TRAVIS |
US
183 |
WIDEN
BRIDGE AND INSTALL LT LANE |
169 |
37 |
VAN
ZANDT |
CR |
REPLACE
BRIDGE AND APPROACHES |
1,010 |
38 |
WISE |
FM
518 |
HMA
OVERLAY |
66,081 |
|
|
|
|
|
|
|
|
TOTAL |
693,452 |
|
|