The TxDOT highway letting is scheduled for May 3-4, 2016. The total tonnage for May is 781,303.
# |
COUNTY |
PROJECT |
DESCRIPTION |
TONS |
1 |
ANGELINA |
US 59 |
HMA LEVEL-UP AND PFC SURFACE |
9,184 |
2 |
BELL |
SH 317 |
WDN, GR, STRS & SURF |
35,359 |
3 |
BELL |
SH 363 |
CNSTR INTCHG |
20,048 |
4 |
BEXAR |
FM 1560 |
GRAD, BSE, STR, SURF, PAV'T MRKNG |
9,975 |
5 |
BEXAR |
SL 1604 |
GR, STRS, BASE, SURF & SIGN |
109,092 |
6 |
BRAZOS |
FM 2154 |
INTERSECTION IMPROVEMENTS |
4,756 |
7 |
CAMERON |
BU 77 |
OVERLAY, PLANING AND PAVEMENT MARKINGS |
44,415 |
8 |
CHEROKEE |
CR |
REPLACE BRIDGE AND APPROACHES |
504 |
9 |
COLLIN |
FM 546 |
GR, PVMT, STR, SIGNS, PVMT MKGS |
24,577 |
10 |
DALLAS |
IH 20 |
INTERSECTION IMPROVEMENTS |
772 |
11 |
DENTON |
FM 455 |
CONSTRUCT PAVED SHOULDERS |
4,701 |
12 |
DENTON |
MR 660 |
BASE RPR & OVRLY AT DENTON STATE SUP LIV |
884 |
13 |
EL PASO |
IH 10 |
WIDEN ROADWAY |
13,413 |
14 |
FAYETTE |
SH 71 |
ACP OVERLAY |
21,307 |
15 |
GUADALUPE |
FM 466 |
GRAD, BSE, SURF, PAV'R MRKNGS |
3,915 |
16 |
HANSFORD |
SH 15 |
RESTORATION OF EXISTING ROADWAY |
58,873 |
17 |
HARRIS |
SH 99 |
CONSTRUCT SB FRTG RD AND U-TURNS |
1,014 |
18 |
HARRIS |
VA |
CONSTRUCT MULTI-USE PATH CONNECTORS |
3 |
19 |
HAYS |
RM 150 |
CONSTRUCT SIDEWALK & BIKE LANES |
188 |
20 |
HUNT |
SS 1570 |
CONSTRUCT ROADWAY |
18,540 |
21 |
JIM WELLS |
FM 1931 |
GRADE,BASE,SURF,STRS |
15,644 |
22 |
KAUFMAN |
US 175 |
HMAC OV, BASE REP |
13,520 |
23 |
KAUFMAN |
MR 682 |
REHABILITATE ROADWAYS-TERRELL STATE HOSP |
225 |
24 |
KERR |
FM 1340 |
ASPHALT PAVEMENT WIDENING |
676 |
25 |
LIBERTY |
SH 146 |
PVMT REPAIR, MILL, ACP |
13,456 |
26 |
LIVE OAK |
US 281 |
SPOT BASE REPAIR AND OVERALY |
25,580 |
27 |
LUBBOCK |
SL 289 |
MILL HOTMIX INLAY |
36,580 |
28 |
MARION |
US 59 |
PLANE ACP, ACP SURF, & PAV MARK |
9,152 |
29 |
MATAGORDA |
SH 60 |
ACP_SH 60_IN MATAGORDA COUNTY |
16,397 |
30 |
McLENNAN |
IH 35 |
PERFORMANCE BASED MAINT. OF HIGHWAYS |
12,455 |
31 |
MONTGOMERY |
FM 1314 |
RESTRIPE ROADWAY FROM 2 TO 4 LANES |
6,510 |
32 |
NACOGDOCHES |
US 59 |
OVERLAY WITH PFC |
9,544 |
33 |
NEWTON |
SH 87 |
BASE REPAIR, SMA |
10,202 |
34 |
PALO PINTO |
CR |
REHABILITATE BRIDGE AND APPROACHES |
381 |
35 |
PARKER |
FM 730 |
HMAC OVERLAY |
47,274 |
36 |
RAINS |
SH 19 |
REHABILITATION OF EXISTING ROAD |
28,665 |
37 |
REFUGIO |
US 77 |
MILL,SEAL AND OVERLAY |
33,404 |
38 |
REFUGIO |
US 77 |
MILL,SEAL AND OVERLAY |
35,212 |
39 |
ROCKWALL |
FM 1138 |
BASE REPAIR,LEVEL UP,OVERLAY |
4,554 |
40 |
RUSK |
US 259 |
BASE REPAIR, OCST, PFC |
30,548 |
41 |
STEPHENS |
US 180 |
RECONSTRUCT URBAN ROADWAY |
32,968 |
42 |
TERRY |
FM 403 |
MILL AND INLAY |
1,225 |
43 |
TITUS |
US 271 |
PLANE ACP, ACP SURF, & PAV MARK |
13,625 |
44 |
TRINITY |
US 287 |
SAFETY TREAT FIXED OBJECTS |
322 |
45 |
WALLER |
US 90 |
CONSTRUCT NEW INTERSECTION |
1,658 |
46 |
WICHITA |
IH 44 |
BRIDGE REHABILITATION OR WIDENING |
6 |
|
|
|
|
|
|
|
|
TOTAL |
781,303 |
|
|