The TxDOT highway letting is scheduled for July 7-8, 2016. The total tonnage for June is 400,424.
# |
COUNTY |
HWY |
TYPE |
TONS |
1 |
AUSTIN |
FM 109 |
INCREASE SUPERELEVATION |
4,748 |
2 |
BEXAR |
IH 10 |
GRAD,STRUC,BASE,SURF, CLEAN & PAINT |
4,110 |
3 |
BLANCO |
US 281 |
CNSTRCT PVD SHLDRS,CORRECT SUPRELV |
1,460 |
4 |
CAMERON |
SH 4 |
REHABILITATION ON SH 04 |
10,580 |
5 |
ECTOR |
IH 20 |
MISCELLANEOUS CONCRETE REPAIR |
17 |
6 |
ERATH |
US 281 |
GR, BS, STRUCTURES AND PAVEMENT |
100,550 |
7 |
FORT BEND |
SS 10 |
GR, STRS, BASE & SURF |
5,293 |
8 |
GRIMES |
SH 6 |
IMPROVE CROSSOVERS AND TURN LANES |
20,710 |
9 |
HARRIS |
IH 10 |
REPLACE RAMP |
768 |
10 |
HARRIS |
FM 2920 |
SEAL COAT, OVERLAY & PV MKS |
31,395 |
11 |
HUNT |
SS 1570 |
CONSTRUCT ROADWAY |
18,540 |
12 |
JOHNSON |
FM 2738 |
YR, BS, DR, STR, & PAVT |
9,102 |
13 |
KARNES |
SH 80 |
REHAB ROADWAY |
23,175 |
14 |
KAUFMAN |
US 80 |
FLEXIBLE PAVE STRUCT RPR & OVERLAY |
4,846 |
15 |
KENDALL |
SH 46 |
GRAD, BSE, STR, SURF, PAV'T MRK |
17,359 |
16 |
McLENNAN |
SH 317 |
WDN, GR, SURF, ADD SHLDRS |
65,151 |
17 |
McLENNAN |
US 84 |
REHAB RDWY, ADD PASS LNS |
57,376 |
18 |
NUECES |
FM 43 |
GRADE, BASE, SURF |
13,994 |
19 |
TARRANT |
CS |
REPLACE BRIDGES AND APPROACHES |
949 |
20 |
WEBB |
SH 44 |
REPLACEMENT OF AN EXISTING BRIDGE |
2,575 |
21 |
WEBB |
FM 1472 |
BASE, GRADE, CONCRETE PAVEMENT, ETC |
7,376 |
22 |
WHARTON |
US 59 |
CALL-OUT CONCRETE PUNCH OUT |
350 |
|
|
|
|
|
|
|
|
TOTAL |
400,424 |
|
|