The TxDOT highway letting is scheduled for December 7th & 8th. The total tonnage of hot mix being let is 623,899.
# | COUNTY | HWY | DESCRIPTION | TONNAGE |
1 | BASTROP | US 290 | FULL DEPTH UNDERSEAL OVERLAY - WB LANES |
3,429 |
2 | BELL | LP 121 | CONSTRUCT LEFT TURN LANE |
2,033 |
3 | BEXAR | IH 410 | MILLING, HOT MIX OVERLAY |
11,326 |
4 | BRAZORIA | SH 35 | MILL, ACP O/L & PAVE MRKS |
11,703 |
5 | BRAZORIA | FM 524 | GR, STRS, LTS, CSB & ACP |
12,301 |
6 | BRISCOE | SH 86 | ASPHALTIC CONCRETE PAVEMENT OVERLAY |
18,198 |
7 | BROOKS, ETC | SH 285, ETC | OVERLAY |
44,799 |
8 | BURLESON | CR | GRADING, STRUCTURE, AND BASE |
18 |
9 | CHEROKEE | FM 752, ETC | SUBGRD, WDN, ACP BS & SURF, OCST, SIGNS, MBGF, PV, MK |
6,800 |
10 | CORYELL | SH 9 | CONSTRUCT INITIAL 2-LANE OF ULTIMATE 40LANE DIVIDE |
100,768 |
11 |
CULBERSON |
SH 54 | REHABILITATION: OVERLAY, SIDEWALKS, ADA RAMPS |
6,620 |
12 | DALLAS | SH 289 | INTERSECTION IMPROVEMENTS |
104 |
13 | DALLAS | I 30 | CONSTRUCT FRONTAGE ROADS AND PARK AND RIDE LOT |
16,404 |
14 | DENTON | FM 156 | ADD 10" SHOULDERS & REHAB; REPLACE BRIDGES |
35,055 |
15 | EL PASO | US 62 | CONSTRUCT NEW OVERPASS STRUCTURE AND RAMPS |
7,869 |
16 | FORT BEND | SH 99 |
GUARDRAIL REPAIR |
30 |
17 | GILLESPIE | US 290 | SPOT REPAIR, SEAL AND OVERLAY |
18,348 |
18 | HARRIS | VA | GENERAL REHAB FOR THE CENTRAL HOUSTON AREA |
176 |
19 | HARRIS | I 10 | SLOPE REPAIR & BASE REPAIR & ACP OVERLAY |
7,448 |
20 | HARRISON | FM 31 | REPLACE BRIDGES & APPROACHES |
1,900 |
21 | HAYS | SH 21 | SEAL & OVERLAY |
13,565 |
22 | HENDERSON |
SH 31 |
SURF TRT, HMA SURF, & PVT MRK |
33,797 |
23 | HENDERSON | FM 314 | SUBGRD WDN, ACP BASE, OCST, SIGNS & PV |
5,782 |
24 | HIDALGO | CS | RECONSTRUCT AND WIDEN TO 4 LANES |
6,479 |
25 | HOPKINS | SH 154 | RECONSTRUCT FROM 2-LN W/O SHLDRS TO 2-LN W/SHLDRS |
2,965 |
26 | HOUSTON | US 287 | METAL BEAM GUARD FENCE RAIL UPGRADE |
195 |
27 | JIM WELLS | FM 665 | INSTALL LEFT TURN LANE OR TWCTL |
1,267 |
28 | JIM WELLS | SH 359 | HMACP LEVEL UP & OVERLAY |
26,570 |
29 | JONES | FM 707, ETC | PROVIDE ADDITIONAL PAVED SURF WIDTH |
13.301 |
30 | LAMAR | FM 137, ETC | GRADE SEPARATION |
10,786 |
31 | LIBERTY | FM 2610 | RESTORE EXIST. ROADAY, FLEX BASE, OCST, PAV. MARK |
510 |
32 | McLENNAN | CS | REPLACE BRIDGE AND APPROACHES |
329 |
33 | MONTAGUE, ETC | FM 455 | SPOT FULL DEPTH REPAIR AND OVERLAY |
15,300 |
34 | MONTGOMERY | IH 45 | WIDEN TO 6 MAINLANES |
17,705 |
35 | MONTGOMERY | IH 45 | ASPHALT PAVEMENT REPAIR |
2,030 |
36 | NEWTON | SH 87 | SAFETY TREAT FIXED OBJECTS & INCREASE SUPERELEV. |
3,641 |
37 | NUECES | SH 358 | MILL AND OVERLAY |
41,152 |
38 | NUECES | US 77 | ACP LEVEL UP AND PAVEMENT MARKINGS |
3,877 |
39 | OLDHAM | US 385 | REHAB ROADWAY |
13,782 |
40 | PARKER | IH 20 | MILL AND OVERLAY |
25,046 |
41 | POTTER | IH 40 | GENERAL MAINTENANCE |
8,700 |
42 | REFUGIO | US 183 | INSTALL LEFT TURN LANE OR TWTL |
1,530 |
43 | REFUGIO, ETC | SH 35 | INSTALL LEFT TURN LANE OR TWCTL |
7,530 |
44 | SAN JACINTO | SH 150 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
9,870 |
45 | SAN PATRICIO | FM 2986 | MILL & OVERLAY |
3,513 |
46 | SAN PATRICIO | US 77 | MILL & INLAY |
7,725 |
47 | SHELBY | US 96 | REPLACE BRIDGE AND APPROACHES |
5,808 |
48 | TARRANT | IH 820, ETC | REPAIR AND OVERLAY |
13,681 |
49 | TARRANT | CS | REPLACE BRIDGE AND APPROACHES |
819 |
50 | TARRANT | SH 199 | REPAIR PAVEMENT REPAIR |
4,600 |
51 | TRAVIS | LP 111 | PA REPAIR, MILL, SEAL AND THIN OVERLAY |
7,339 |
52 | TRAVIS | US 183 | PAV SURF REHAB - IN PLACE RECYCLE |
5,230 |
53 | TRAVIS | US 183 | LENGTHEN LTL & ADD SAFETY LIGHTING |
1,903 |
54 | TRAVIS | FM 1626 | LEVEL UP, SEAL AND OVERLAY |
6,433 |
55 | TRAVIS | MR 678 | NEW PARKING LOTS, AND PAVEMENT REPAIR |
258 |
56 | UVALDE | US 90 | WIDEN ROADWAY TO PROVIDE PASSING LANES |
8,718 |
57 | WASHINGTON | US 290 | INSTALL MEDIAN BARRIER |
211 |
58 | WILLIAMSON | FM 971 | SEAL COAT |
1,100 |
59 | ZAPATA | VA | PARK AND BOAT RAMP IMPROVEMENTS |
525 |
60 | ZAVALA | FM 1433, ETC | RESURFACE |
9,911 |
TOTAL |
623,899 |