The TxDOT highway letting is scheduled for September 8 & 9. The total tonnage of hot mix being let is 815,639.
# |
County |
Hwy |
Description |
Tonnage |
1 |
ATASCOSA | IH 35 | RELOCATE EXIST RAMP & CONST SB FRNTG RD |
4,082 |
2 |
BEXAR | LP 1604 | GRAD, BASE, STR, SURF, PAV'T MRKNG |
3,605 |
3 |
BEXAR | LP 345 | MILL, BASE REPAIR, SEAL COAT, OVERLAY & PAV MRKING |
15,850 |
4 |
BRAZOS |
FM 2818 | SMA OVERLAY |
21,623 |
5 |
CAMERON, ETC. | LP 499, ETC | OVERLAY |
76,057 |
6 |
DALLAS |
CS, ETC | EXTEND GRD SEPARATION OF GALATYN PKWY & US 75 |
1,544 |
7 |
DENTON |
FM 423 | WIDEN TO SIX/EIGHT LANE URBAN |
51,368 |
8 |
EL PASO | SH 20 | INTERSECTION IMPROVEMENTS AND REHABILITATION |
7,560 |
9 | EL PASO | LP 375 | CONV RDWY TO FRWY, STRUCT, PAVE, FR RDS |
48,447 |
10 |
EL PASO, ETC. | VA, ETC | IMPROVE GUARDRAIL, WIDEN PAVEMENT AND SEAL COAT |
9,909 |
11 | FANNIN, ETC. | US 69 | OVERLAY |
3,074 |
12 |
GALVESTON | FM 646 | BS REPAIR, OCST & OVERLAY |
13,060 |
13 |
GALVESTON | FM 3005 | PLANE,BASE REPAIR, ASPHALT O/L,AND PAVEMENT MRKS |
10,853 |
14 |
HALL, ETC. | US 287 | OVERLAY |
40,940 |
15 | HARRIS | MH | CONSTRUCT 8-LANE DIVIDED (RAISED MEDIAN) URBAN ST. |
6,177 |
16 |
HARRIS | IH 10 | INSTALL UTURNS |
169 |
17 | HARRIS | PW | CONSTR ROADS & PARKING |
2,859 |
18 |
HIDALGO | SH 364 | CONST 4 LN DIV URBAN |
12,190 |
19 |
JOHNSON | PR 21 | REPLACE BRIDGE |
957 |
20 |
KARNES | US 181 | MISCELLANEOUS ROADWAY WORK |
4,239 |
21 |
KENDALL | RM 474 | REHAB, TURN LNS, CURB, SDWLK, RECONFIGURE INT @ ESSER |
9,670 |
22 |
KNOX | SH 222, ETC | CONSTRUCTION OF MISCELLANEOUS WORK |
2,327 |
23 | LLANO | SH 71 | UPGRADE TO SUPER 2 |
1,741 |
24 |
MARTIN | IH 20 | MILLING, HMAC & STRIPING |
14,820 |
25 |
MCCLENNAN | IH 35 | WIDENING, GRADING, STRUCTURES & SURFACING |
178,863 |
26 |
MONTAGUE | FM 3301 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
6,244 |
27 |
NACOGDOCHES | FM 225 | CONSTRUCT PAVED SHOULDERS AND OVERLAY |
17,165 |
28 |
NUECES | PW | RESURFACING OF ROADWAY & PARKING |
9,574 |
29 |
ORANGE | FM 105 | RECONSTRUCT AND ADD SHOULDERS |
16,174 |
30 |
PARKER |
US 180 | FLEXIBLE PAVEMENT STRUCTURE REPAIR |
3,800 |
31 | PARKER | IH 20 | MILL AND OVERLAY |
54,825 |
32 |
SHELBY | FM 699 | REHAB & WIDEN EXISTING PVMT |
158 |
33 |
TARRANT | IH 30 | HMAC OVERLAY |
20,724 |
34 | TARRANT | IH 20, ETC. | REPAIR FAILURES, UTBHMWC AND STRIPE |
26,046 |
35 |
TAYLOR | US 83 | IMPROVE INTERSECTION MOVEMENTS |
433 |
36 |
VICTORIA, ETC. | US 87 | PAVEMENT UPGRADE ON 4-LANE FACILITY |
58,292 |
37 |
WALKER | SH 30 | CONSTRUCT GRADE SEPARATION |
22,912 |
38 |
WALKER |
IH 45 | CONVERT FRT RD TO ONE-WAY OPERATION |
37,308 |
|
|
|||
|
TOTAL | 815,639 |