The TxDOT highway letting is scheduled for June 5th & 6th. The total tonnage of asphalt pavements being let is 962,733.
# | COUNTY | HWY |
TYPE | TONS |
1 | ANGELINA |
US 59, ETC. |
REPLACE RAILROAD UNDERPASS, CONSTRUCT INTERCHANGE | 50,211 |
2 | BAYLOR |
US 277 |
UPGRADE TO 4-LANE DIVIDED FACILITY |
36,634 |
3 | BELL |
US 190 |
PAVEMENT REPAIR |
4,277 |
4 | BRAZORIA |
FM 2611 |
ACP OVERLAY |
4,032 |
5 | BRAZORIA |
CS |
REPLACE BRIDGE & APPROACHES |
496 |
6 | BROWN |
US 84, ETC. |
WDN SUBGRADE, BASE, SURF, STR, C&G |
23,175 |
7 | BROWN |
CS |
CONSTRUCT NEW ROADWAY |
2,121 |
8 | CAMERON |
CS |
WIDEN TO 4 LANES | 1,780 |
9 | CAMERON |
US 77 |
PAVEMENT REPAIR |
2,825 |
10 | COLLIN |
SH 289 |
WIDEN TO 4-LANE URBAN - ULT 6-LANE |
35,473 |
11 | COLLIN |
SH 78 |
WIDEN TO 6-LANE DIVIDED |
43,273 |
12 | COLORADO |
FM 333 |
REPLACE BRIDGE & APPROACHES |
147 |
13 | DALLAM |
US 54 |
REHAB EXIST RDWY & ADD PASSING LANES |
60,872 |
14 | DALLAS |
IH 35E |
FULL DEPTH REPAIR & ACP OVERLAY |
27,224 |
15 | DENTON |
SH 114 |
WIDEN 2-LANE TO 4-LANE DIVIDED RURAL HIGHWAY |
27,832 |
16 | DENTON |
US 380 |
PAVEMENT WIDENING & THERMOPLASTIC STRIPING |
2,835 |
17 | EDWARDS |
RM 674 |
LRA LEVEL UP |
3,800 |
18 | ELLIS |
US 67 |
CONSTRUCT NEW FRONTAGE ROADS OVER UP RR |
10,338 |
19 |
ELLIS |
US 287, ETC. |
ACP OVERLAY & PAVEMENT MARKINGS |
61,802 |
20 |
GALVESTON |
IH 45 |
INSTALL LEFT TURN LANES |
133 |
21 |
GRAYSON |
FM 691 |
BASE REPAIR |
2,745 |
22 | HARRIS |
US 90 |
ADD RAMP REVERSAL |
1,305 |
23 | HARRIS |
IH 45 |
ROUTINE MAINTENANCE OF IH 45 |
9,150 |
24 | HARRIS |
SH 146 |
CONSTRUCT NB DIRECT CONNECTOR |
802 |
25 | HARRIS |
FM 1960 |
TRAFFIC SIGNAL |
1,380 |
26 | HARRIS |
FM 1485, ETC. |
INSTALL LEFT-TURN LANES AT 4 LOCATIONS |
3,031 |
27 | HARRIS |
US 59 |
INTERSECTION IMPROVEMENTS |
208 |
28 | HARRISON |
IH 20 |
PLANING, CONC PVMT REPAIR, ACP & PVMT MARKINGS |
34,862 |
29 |
HAYS |
FM 2001 |
FULL DEPTH EDGE REPAIR AND 2CRS SEAL |
16,629 |
30 |
HAYS |
RM 12 |
INTERSECTION REPAIRS, THIN OVERLAY & PVMT MARK |
7,265 |
31 | HIDALGO |
US 83 |
PAVEMENT REPAIR |
8,191 |
32 | HILL |
SH 22 |
PAVEMENT REPAIR |
3,818 |
33 | HOPKINS |
IH 30 |
ON CALL POTHOLE REPAIR |
1,200 |
34 | HUNT |
US 69 |
ON CALL POTHOLE REPAIR |
875 |
35 | JEFFERSON |
US 69 |
ILLUMINATION & TRAFFIC SIGNAL MAINTENANCE |
20 |
36 | JEFFERSON |
PW |
RECONSTRUCT PARK ROADS, PULLOUTS & PARKING LOTS |
1,970 |
37 | JIM WELLS |
FM 625 |
HMACP |
4,760 |
38 | KENEDY |
US 77 |
CONSTRUCT OVERPASS |
30,554 |
39 |
KING |
US 82 |
WIDENING OF A NON-FREEWAY FACILITY |
85,778 |
40 | LAMPASAS |
FM 2657 |
WIDEN, GRADING, STRUCTURES, BASE, AND SURFACE |
13,296 |
41 | MARION |
US 59 |
GR, BASE, CONC PVMT, SURF TRMT & PAV MRK |
69 |
42 | MCLENNAN |
US 84 |
PLANING, ACP INLAY, LEVEL-UP, BASE REP |
7,009 |
43 | MCLENNAN |
FM 1695 |
WDN, GR, STRS & SURF |
19,223 |
44 | MENARD |
US 83 |
LRA LEVEL UP |
3,320 |
45 | MIDLAND |
IH 20 |
PLANING, HOT MIX, CRACK ATTENUATING MIX & PVMT MRK |
82,153 |
46 | MONTGOMERY |
FM 1097 |
INSTALL LEFT TURN LANES |
827 |
47 | NACOGDOCHES |
FM 225 |
CULVERT REPLACEMENT |
245 |
48 | NUECES |
FM 257 |
REHAB OF AN EXISTING ROADWAY |
2,004 |
49 |
PARKER |
IH 20 |
RELOCATE EXIT RAMP |
3,803 |
50 | PARKER |
US 180 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR |
1,550 |
51 | POLK |
US 287 |
RECONSTRUCT & WIDEN PAVEMENT |
33,141 |
52 |
RED RIVER |
US 82 |
POTHOLE REPAIR |
480 |
53 |
SAN PATRICIO |
SH 188 |
REHAB |
12,854 |
54 |
SMITH |
SH 110 |
OVERLAY |
7,206 |
55 |
TAYLOR |
IH 20 |
RECONSTR FRTG RDS, RELC RAMPS, ADD TURN-AROUNDS |
95,149 |
56 |
TITUS |
US 67 |
UTBHMWC OVERLAY & PAVEMENT MARKINGS |
3,874 |
57 |
TRAVIS |
IH 35 |
MILL AND OVERLAY IH 35 FRONTAGE ROAD |
14,614 |
58 |
WICHITA |
US 82 |
REPLACE BRIDGE & APPROACHES |
357 |
59 |
ZAPATA |
US 83 |
REHABILITATION & WIDEN PAVEMENT (SUPER 2) |
47,736 |
TOTAL | 962,733 |