The TxDOT highway letting is scheduled for October 9th & 10th. The total tonnage of asphalt pavements being let is 996,022.
# | COUNTY | HWY |
TYPE | TONS |
1 | ANGELINA |
SP 339 |
RESURFACE AND WIDEN FOR CTWLTL WITH C&G SECTION |
13,159 |
2 | AUSTIN |
FM 331 |
REPLACE BRIDGE AND APPROACHES |
256 |
3 | BEE |
SH 72 |
REHAB ROADWAY AND ADD PASSING LANES |
79,919 |
4 |
BELL | SH 317 | WIDEN FROM TWO TO FOUR LANES WITH RAISED MEDIAN |
13,363 |
5 |
BELL |
US 190 |
WIDEN FROM FOUR TO SIX LANES AND RESURFACE |
220,662 |
6 |
BRAZORIA |
SH 288 |
CONSTRUCT TURNAROUND |
74 |
7 |
BRAZORIA |
BS 288B |
REPLACE BRIDGE AND APPROACHES |
7,104 |
8 |
BRAZORIA |
BS 35-C |
SEAL COAT, ACP OVERLAY, & PVMNT MRKS |
9,872 |
9 |
BURNET |
SH 71, ETC |
CONSTRUCT CONTINOUS LEFT TURN LANE |
2,858 |
10 |
CHAMBERS |
LP 207 |
OVERLAY EXISTING ROADWAY |
1,292 |
11 |
COMAL |
FM 306 |
WIDEN TO PROVIDE TURN LANE |
11,591 |
12 | DALLAS |
US 67 |
FULL DEPTH REPAIR CONC PVMT & HMAC OVERLAY |
2,359 |
13 | DALLAS |
IH 30 |
CONSTRUCT 2 LANE EASTBOUND FRONTAGE ROAD |
3,672 |
14 |
DALLAS |
IH 35E |
FULL DEPTH REPAIR AND ACP OVERLAY OF FRONTAGE RDS |
12,344 |
15 |
DEWITT |
SH 72 |
ACP OVERLAY |
12,451 |
16 |
DIMMIT |
SH 85, ETC |
OVERLAY |
58,939 |
17 |
EASTLAND |
IH 20 |
CONSTRUCT TWO SAFETY REST AREAS |
10,362 |
18 |
ECTOR |
IH 20 |
PAVEMENT REPAIR |
16,533 |
19 |
EL PASO |
IH 10 |
INTCHG IMPRV INCL CNSTR DIRECT CONNECT |
16,669 |
20 |
ELLIS |
IH 35E |
REHABILITATE EXISTING SB AND NB FRONTAGE ROADS |
45,328 |
21 |
FORT BEND |
US 59 |
GENERAL ROUTINE MAINTENANCE OF US 59 |
5 |
22 |
HARDIN |
FM 770 |
OVERLAY EXISTING ROADWAY |
6,651 |
23 |
HARDIN |
SH 326 |
INLET AND CULVERT REPAIRS |
3 |
24 |
HARRIS |
IH 10 |
INTERSECTION IMPROVEMENTS |
5,354 |
25 |
HARRIS |
IH 610 |
RECONST US290/IH610 INCLDG IH10 TO US290 OUT DCS |
21,097 |
26 |
HARRIS |
FM 529 |
GR, STRS, BASE AND SURF |
11,076 |
27 |
HAYS |
RM 967 |
CONSTRUCT TURN LANES |
1,461 |
28 |
HIDALGO |
US 83 |
ACP OVERLAY |
18,041 |
29 |
HOUSTON |
SH 7 |
REALIGN INTERSECTION |
4,918 |
30 |
KNOX |
US 82 |
ASPHLTIC CONCRETE OVERLAY |
11,605 |
31 |
LASALLE |
IH 35, ETC |
OVERLAY |
80,667 |
32 |
LIBERTY |
FM 563 |
PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
30,623 |
33 |
MIDLAND |
SH 158 |
REHABILITATION OF EXISTING ROAD |
64,595 |
34 |
MONTGOMERY |
SH 105 |
WIDEN WB FROM 2 TO 3 LANES |
271 |
35 |
MONTGOMERY, ETC |
SH 105 |
TURN LNS,PASS LNS, BS REP,OCST,O/L |
64,811 |
36 |
NUECES |
US 77 |
MILL, UNDERSEAL & INLAY |
5,700 |
37 |
POTTER |
VA |
STATEWIDE CURB RAMP PROGRAM |
280 |
38 |
RANDALL |
US 60 |
ACP OVERLAY |
84,837 |
39 |
SUTTON |
SL 467, ETC |
REHABILITATE TOWN SECTION |
10,247 |
40 |
TRAVIS |
US 290 |
PROVIDE SIGNALIZED INTERSECTIONS |
10,274 |
41 |
WOOD |
SH 154 |
ADD SHOULDERS AND REHABILITATE ROADWAY |
24,699 |
|
||||
TOTAL | 996,022 |