The TxDOT highway letting is scheduled for March 6th and 7th. The total tonnage of asphalt pavements being let is 785,932 .
# | COUNTY | HWY |
TYPE | TONS |
1 | BEXAR | LP345 | GRAD, BASE, STR, SURF & PAV'T MRKNG | 16,415 |
2 | BEXAR | IH10 | MILL, RETAINING WALL, SURFACE | 34,317 |
3 | BRAZORIA | SH35 | REPLACE BRIDGE AND APPROACH | 3,028 |
4 | BROWN | FM2524 | REHABILITATE EXISTING ROAD | 18,061 |
5 |
CALDWELL | US183 | PAVEMENT REPAIR,MILL,SEAL&O/L | 60,864 |
6 |
CAMERON | VA | PEDESTRIAN AND BICYCLE TRAIL | 860 |
7 | DALLAS | SH183 | MILL,INLAY,FDRCP,PAV MRKS | 12,312 |
8 | DALLAS | IH35E | FULL DEPTH REPAIR | 1,223 |
9 | EL PASO | US62 | MILL AND INLAY | 15,294 |
10 |
ELLIS | FM1387 | GRADING, PAVING, STRUCTURES, SIGNS | 6,110 |
11 |
ELLIS | US77 | INSTALL RAISED MEDIAN | 1,731 |
12 |
ERATH | BU377J | BS REPAIR AND HMAC OVERLAY | 11,199 |
13 | FANNIN | SH121 | HEAVY OVERLAY | 33,602 |
14 | FT. BEND | FM2759 | BASE REPAIR, ACP OVERLAYPAV MRKS | 8,312 |
15 |
GALVESTON | FM646 | BS REPR, PLAN & ACP O/L | 7,550 |
16 | GALVESTON | FM0518 | STORM DRAINAGE REPAIR | 632 |
17 | GILLESPIE | US0087 | MILL, SEAL AND OVERLAY | 6,733 |
18 | HALL | FM1041 | REMOVE DIPS & REPLACE W/ CULVERTS | 512 |
19 | HARRIS | US90A | RECONSTRUCT AND FULL DEPTH REPAIR | 3,352 |
20 | HARRIS | SH003 | 1 1/2"ACP OVERLAY | 7,734 |
21 |
HARRIS | US290 | GR, STRS, BASE, PAVE, DET POND | 119,039 |
22 |
HARRIS | US290 | GR, STRS, BASE AND PAVE | 54,290 |
23 |
HARRIS | BS1046 | BASE REPAIR,OVERLAY AND STRIPING | 1,508 |
24 |
HARRISON | US0080 | BRIDGE MAINTENANCE | 110 |
25 |
HENDERSON | SH31 | PVMT RPR,PLNG,CAM,OCST,HARST,HMAC | 29,395 |
26 |
JEFFERSON | SH73 | ACP, SHLDR TEXTURE | 37,647 |
27 |
JIM WELLS | SH44 | OVERLAY,SEAL & FULL-DEPTH REPAIR | 58,638 |
28 |
KAUFMAN | FM740 | GR, BASE, PVMT, HMAC, PVMT MKGS | 15,292 |
29 |
LAVACA | US77A | ACP OVERLAY | 23,431 |
30 |
LUBBOCK | FM2275 | MILLING, SEAL COAT, HOT MIX INLAY | 1,724 |
31 |
MADISON | SH0075 | HMA OVERLAY | 8,280 |
32 |
MORRIS | US259 | ADD SHLDS, BASE, ACP & PVMT MRKS | 57,277 |
33 | NAVARRO | IH45 | EDGE RP, BS REP, LEV-UP OV | 14,140 |
34 |
NUECES | FM43 | GRADE,BASE,SURF,STRS | 25,076 |
35 |
ORANGE | FM105 | GR, BS, ACP, MBGF, STR, STRIPE | 22,816 |
36 |
PALO PINTO | SH254 | HMAC OVERLAY AND BASE REPAIR | 23,093 |
37 | PARKER | IH30 | GRADING, DRAINAGE, STRUCTURE & PAVE | 21,908 |
38 |
POLK | VA | REPAIR AND RESURFACE PAVED AREAS | 3,513 |
39 |
SHACKLEFORD | FM601 | REHABILITATE BRIDGE | 26 |
40 |
SMITH | FM14 | SBGRD WDN,ACP BS,OCST, HMAC, PVT MK | 6,526 |
41 | TARRANT | US0287 | PLANING AND OVERLAY | 2,979 |
42 |
TRAVIS | FM734 | ADD LEFT AND RIGHT TURN LANES | 4,958 |
43 | TRAVIS | RM3238 | THIN OVERLAY | 3,303 |
44 | WALLER | FM1887 | BS REPR,SC,LVL UP,ACP O/L & PAV MRK | 12,172 |
45 | WHARTON | US59 | PAVEMENT REPAIR & SURFACING | 4,285 |
46 | WHARTON | SH71 | REPLACE BRIDGE AND APPROACHES | 1,446 |
47 | WILLIAMSON | FM1460 | MILL, SEAL AND OVERLAY | 2,500 |
TOTAL | TOTAL ALL PROJECT | 804,213 |