The TxDOT highway letting is scheduled for November 5th and 6th. The total tonnage of asphalt pavements being let is 503,814.
# | COUNTY | HWY |
TYPE | TONS |
1 | BASTROP | US290 | WIDEN GR STRS BS & SURF | 146,854 |
2 | BRISCOE | SH207 | WIDENING OF NON-FREEWAY FACILITY | 30,453 |
4 | CALDWELL | US183 | RECONSTRUCT TO 5-LN URBAN SECTION | 32,193 |
5 | COLLIN | SH121 | GRD, STR, BASE, PVMT, SIGNS | 77,486 |
6 | COLORADO | US90A | REPLACE BRIDGE AND APPROACHES | 5,358 |
7 | DALLAS | FM1382 | INTERSECTION IMPROVEMENTS | 1,870 |
8 | DALLAS | SL12 | PLANE,OVRLAY,PVMT MKG,BRDG DECK,& JOINTS | 96 |
9 | EL PASO | SH20 | INTERSECTION IMPROVEMENTS | 19 |
10 |
FALLS | FM147 | WDN, GR, BS, SURF, ADD SHLDRS | 7,642 |
11 |
GONZALES | FM443 | CONSTRUCTION OF STRUCTURE IMPROVEMENTS | 73 |
12 |
GRIMES | SH105 | MILL AND INLAY | 5,133 |
13 | HARRIS | FM865 | GR, BS & SURF | 3,175 |
14 | HARRIS | US290 | GR, STRS, BASE AND PAVE | 28,012 |
15 |
HARRIS | IH610 | GR, STRS, BASE AND PAVE | 29,168 |
16 | HARRIS | US290 | ASPHALT & POTHOLE REPAIR | 100 |
17 | HOPKINS | FM69 | REHABILITATION OF EXISTING ROAD | 400 |
18 | LIPSCOMB | RM2248 | REPLACE BRIDGE AND APPROACHES | 391 |
19 | LIVE OAK | US281 | OVERLAY ROADWAY | 40,889 |
20 | MADISON | IH45 | HMA OVERLAY | 17,803 |
21 |
NUECES | MR670 | SEAL COAT | 627 |
22 |
SHERMAN | US54 | REHAB EXIST RDWY & ADD PASSING LANE | 23,155 |
23 |
SMITH | LP323 | REPLACE EXISTING RAILROAD UNDERPASS | 16,577 |
24 |
TRAVIS | SH71 | ADD LEFT TURN LANE & SHOULDERS | 36,340 |
TOTALS SCHEDULED FOR NOVEMBER | 503,814 |