The TxDOT highway letting is scheduled for July 8-9, 2014. Total tonnage of asphalt pavements being let is 777,300.
# | COUNTY | HWY |
TYPE | TONS |
1 | ATASCOSA | SH97 | GRAD, BSE, SURF, PAVMT MRK | 56,802 |
2 | BEXAR | IH10 | SC, STRIPING, BASE | 44,350 |
3 | BRAZOS | SH6 | HMA MILL AND INLAY | 2,740 |
4 | BRAZOS | VA | CONSTRUCT SIDEWALK CURB RAMPS | 656 |
5 | BROWN | US67 | MILL AND INLAY | 1,393 |
6 | BROWN | US377 | MILL AND INLAY | 1,393 |
7 | CALDWELL | FM713 | REPLACE BRIDGE & APPROACHES | 388 |
8 | CAMERON | VA | CONSTRUCT BSIF | 5,497 |
9 | CARSON | SH207 | RESTORATION OF EXISTING ROADWAY | 76,114 |
10 |
COLLIN | SH5 | BASE REPAIR AND OVERLAY | 9,812 |
11 |
COLLIN | FM1378 | REPL BRIDGE | 2,834 |
12 | COLLIN | FM546 | GR, BASE, PVMT, PVMT MKGS, SIGNS | 24,372 |
13 | CULBERSON | US62 | ASPHALTIC CONCRETE PAVEMENT OVERLAY | 49,039 |
14 |
DALLAS | CS | REPL BR & APPRS | 1,375 |
15 | DALLAS | IH30 | GRADING,PAVEMENT,SIGNS,PVMT MKGS | 9,398 |
16 | DENTON | FM2499 | GR, DR, STR, SURF & CONC PAV | 41,325 |
17 | DUVAL | US59 | BASE, MILL, ACP INLAY, PAV MRKS | 19,016 |
18 | ECTOR | IH20 | STRUCTURE, TRF CONTROL & PVMT MRKGS | 7,704 |
19 | EL PASO | SH20 | TRAFFIC OPERATION | 168 |
20 |
EL PASO | IH10 | ADD 1 LANE EACH DIRECTION | 2,095 |
21 |
EL PASO | FM1110 | REPLACE BRIDGE | 7,809 |
22 |
ELLIS | FM55 | GR, BASE, PVMT MKGS, SIGNS | 9,942 |
23 |
FAYETTE | FM615 | BASE, STURCTURAL, SURFACING | 174 |
24 | FRIO | US57 | GRADE, BASE, SC, SURF, PAVMT MRK | 36,138 |
25 | GALVESTON | FM646 | INST CULV,ADJ DRWAYS & RESTORE DRNG | 1,602 |
26 | GRAYSON | FM902 | HAZARD ELIMINATION & SAFETY | 3,502 |
27 | GREGG | FM2208 | SIGNAL | 1,414 |
28 | GRIMES | SH30 | CONSTRUCT GRADE SEPARATION | 15,944 |
29 | HALE | CS | PLANE, ACP, SURFACE COURSE | 2,235 |
30 | HALL | FM1547 | CONSTRUCT RR GRADE SEPARATION STR | 1,195 |
31 | HARRIS | IH69 | PLAN, SC & THIN O/L (FRTG RD) | 14,719 |
32 | HARRIS | SH99 | CONSTRUCT TWO 2-LN FRONTAGE ROADS | 8,031 |
33 | HARRIS | US290 | GR, STRS, BASE AND PAVE | 14,048 |
34 | HARRIS | IH45 | REPLACE BRIDGE AND APPROACHES | 408 |
35 | HARRIS | CR | CONSTRUCT 4-LANE BOULEVARD | 3,650 |
36 | HARRIS | US90A | REPLACE BRIDGES | 2,061 |
37 | HAYS | LP82 | CONST RAILROAD GRADE SEPARATION STR | 18,774 |
38 | HIDALGO | FM493 | RECONSTRUCT & ADD SHOULDERS | 28,355 |
39 | HUNT | FM2101 | HAZARD ELIMINATION & SAFETY | 10,146 |
40 | JEFFERSON | FM366 | FM 366 FULL DEPTH PAVEMENT REPAIRS | 204 |
41 | JIM WELLS | FM665 | GRADE,BASE,SURF,STRS | 9,060 |
42 | KAUFMAN | US80 | BS,CMT TR,FLX BS,STR,HMAC,WDN,MRKS | 81,429 |
43 | LEON | FM831 | ROADWAY RESTORATION | 219 |
44 | MCLENNAN | SH6 | ADD LFT TRN LN & SHLDRS | 9,785 |
45 | MCLENNAN | FM185 | WDN, GR, BS, SURF, ADD SHLDRS | 14,107 |
46 | MCMULLEN | SH16 | GRADE, BASE, SURF, PAVMT MRK | 28,110 |
47 | MONTGOMERY | FM3083 | CONSTRUCT GRADE SEPARATION | 9,214 |
48 | MOORE | US284 | REHABILITATION | 18,396 |
49 | NACOGDOCHES | US59 | INSTALL RAISED MEDIAN | 16,087 |
50 | NACOGDOCHES | CR | BRIDGE REPLACEMENT | 160 |
51 | POLK | US287 | IMPROVE GUARDRAIL AND SAFETY TREAT | 328 |
52 | ROCKWALL | SH205 | MILL,REPAIR,OL,STR,MRKS,SIGNS | 10,134 |
53 | ROCKWALL | FM3097 | WIDEN ROADWAY | 11,221 |
54 | SMITH | CR | RPLC BRG&APPRCH,GR,ACP BS&SURF,MBGF | 491 |
55 | WALLER | US90 | INSTALL LEFT TURN LANE | 805 |
56 | WEBB | US83 | ACP OVERLAY, PAV MRKS | 15,476 |
57 | WICHITA | CR | REPLACE BRIDGE AND APPROACHES | 160 |
58 | WILLIAMSON | US183 | MILL, SEAL & OVERLAY FRONTAGE RD | 8,775 |
59 | WILLIAMSON | RM1869 | LEVEL UP, SEAL COAT | 3,605 |
60 | WILLIAMSON | SH95 | LEVEL UP & SEAL COAT | 1,265 |
61 | WILLIAMSON | RM1431 | MILL, SEAL, OVRLAY & RESTRP TO 6-LN | 1,651 |
TOTAL TONNAGE FOR JULY LETTING | 777,300 |