The TxDOT highway letting is scheduled for March 5-6, 2015. Total tonnage of asphalt pavements being let is 1,159,698.
# |
COUNTY |
HWY |
TYPE |
TONS |
1 | ANDERSON | CR | REPLACE BRIDGE AND APPROACHES | 374 |
2 | ARCHER | US281 | REHABLIITAITION OF EXISTING ROAD | 86,814 |
3 | ATASCOSA | IH37 | R, BASE & PAVEMENT MARKINGS | 24,265 |
4 | BEXAR | IH10 | SLOPE REPAIR | 628 |
5 | BLANCO | RM3232 | PROVIDE ADDITIONAL PAVED SURFACE WI | 3,306 |
6 | BLANCO | RM2766 | PROVIDE ADDITIONAL PAVED SURFACE WI | 5,019 |
7 | BOWIE | IH369 | PAV REP, PLANING, ACP & PAV MRKS | 5,934 |
8 | BRAZORIA | SH288 | CONST SB ON-RAMP & NB OFF-RAMP | 6,792 |
9 | BRAZOS | FM60 | REHABILITATE EXISTING ROAD | 11,744 |
10 | BROWN | US67 | HOT MIX MILL & INLAY | 1,728 |
11 | CASS | SH77 | GR, STR, BASE, C&G, ACP, ILL & PVT | 26,655 |
12 | CHAMBERS | IH10 | GR, BS, OCST, STRIPE | 8,869 |
13 | COLLIN | FM2514 | PVT,DRAINAGE,SIGNS,PVT,MKGS | 12,074 |
14 | COLLIN | FM3356 | FLEXIBLE PVMT STRUCTURE REPAIR & OVERLAY | 1,420 |
15 | COLORADO | US90A | CONSTRUCT SUPER 2 LANES | 51,515 |
16 | CULBERSON | RM652 | OVERLAY MAIN LANES | 45,691 |
17 | DALLAS | SH78 | MILL,CONC,REPAIR & OVERLAY | 18,825 |
18 | DALLAS | SL12 | FDR-CP AND OVERLAY ON FRONTAGE RDS | 7,299 |
19 | DALLAS | VA | CONSTRUCT CURB RAMPS | 48 |
20 | DELTA | SH24 | MILLING & HOTMIX INLAY | 27,730 |
21 | DENTON | MR660 | BASE REPAIR, OVERLAY & UPGRADE PED RAMPS | 660 |
22 | DEWITT | SH119 | RESTORE ROADWAY | 15,733 |
23 | DIMMIT | SH85 | ACP OVERLAY, PAV MRK | 92,017 |
24 | ELLIS | FM55 | GR, BASE, PVMT, PVMT MKGS, SIGNS | 6,248 |
25 | ELLIS | US287 | FLEXIBLE PVMT STRUCTURE REPAIR & OVERLAY | 4,200 |
26 | ELLIS | FM664 | ADD 3-FOOT PAVED SHOULDERS | 56,563 |
27 | ERATH | US281 | BS REPAIR AND HMAC OVERLAY | 11,094 |
28 | FT BEND | FM521 | BS REP, ACP O/L, W/PV MKS | 13,067 |
29 | GILLESPIE | SH16 | MILL, SEAL & THIN OVERLAY | 2,608 |
30 | GONZALES | US183 | ACP OVERLAY | 12,830 |
31 | HARDIN | FM943 | GR, BS, PVMT | 21,113 |
32 | HARDIN | US69 | PLANE AND OVERLAY VARIOUS ROADWAYS | 7,861 |
33 | HAYS | SH80 | MILL, SEAL AND INLAY | 1,906 |
34 | HENDERSON | CS | REPLACE BRIDGE AND APPROACHES | 241 |
35 | HIDALGO | BU83S | OVERLAY | 51,071 |
36 | JASPER | FM777 | FM 777 PAVEMENT WIDENING | 2,969 |
37 | JEFFERSON | CR | STR, BASE, ACP | 539 |
38 | JOHNSON | SH174 | OVERLAY | 14,400 |
39 | KAUFMAN | IH20 | FLEXIBLE PVMT STRUCTURE REPAIR & OVERLAY | 13,294 |
40 | LAMB | FM54 | PLANE, CEM TRT, SURF TRT, HOT MIX | 1,402 |
41 | LIVE OAK | IH37 | GRADE,BASE,SURF | 104,294 |
42 | LUBBOCK | US84 | MILLING, ACP, ONE-COURSE,& STRIPING | 70,207 |
43 | MADISON | SH21 | WIDEN ROADWAY TO SUPER 2 HIGHWAY | 60,525 |
44 | MAVERICK | FM1021 | ACP OVERLAY AND PAVEMENT MARKINGS | 36,276 |
45 | MONTAGUE | US82 | OVERLAY | 41,788 |
46 | NAVARRO | FM55 | FLEXIBLE PAV STRUCTURE REPAIR & OVERLAY | 6,750 |
47 | NUECES | IH37 | MILL, SEAL AND OVERLAY | 7,031 |
48 | ORANGE | CS | GR,BS, STR, PVMT | 597 |
49 | POTTER | VA | CONSTRUCT CURB RAMPS | 35 |
50 | SAN PATRICIO | US181 | OVERLAY ROADWAY | 34,671 |
51 | SAN PATRICIO | FM2046 | MILL, SEAL AND OVERLAY | 4,904 |
52 | SMITH | CR | REPLACE BRIDGE AND APPROACHES | 492 |
53 | TARRANT | US377 | OVERLAY | 21,290 |
54 | TAYLOR | SH351 | FL BS,STRS,PCTB,C&G,SDWLK,DRVWY,SMA | 7,654 |
55 | TAYLOR | IH20 | PLANE,BASE RPR,1CST,ACP OL, & MBGF | 5,020 |
56 | TOM GREEN | RM584 | ACP OVERLAY | 15,989 |
57 | TRAVIS | FM1825 | FULL DEPTH REPAIR, SEAL & OVERLAY | 1,392 |
58 | TRAVIS | RM2222 | MILL, SEAL & OVERLAY | 3,652 |
59 | TRAVIS | RM2222 | CONSTRUCT DUAL LEFT TURN LANE | 1,632 |
60 | UPSHUR | SH300 | CMT TRT BASE, ACP & PVMT MARKINGS | 25,638 |
61 | WICHITA | US287 | MILL & INLAY | 1,632 |
62 | WICHITA | SH240 | REPLACE BRIDGE AND APPROACHES | 181 |
63 | WILLIAMSON | CS | REPLACE BRIDGE & APPROACHES | 204 |
64 | WISE | SH114 | HMAC OVERLAY | 31,298 |
TOTAL TONNAGE FOR MARCH LETTING | 1,159,698 |